1. Question Content...
Question1: Which of the following one is the method of reducing system nervousness?
Question5: The major effect that just-in-time has on forecasting it's shortened,
Question7: What is calculated by taking into account the work center utilization and efficiency?
Question12: Capacity needs to be measured on following levels EXCEPT:
Question17: Which of the following best describes JIT?
Question18: Extranet is an internet shared by two or more companies.
Question20: The capacity requirements plan occurs at the level of:
Question21: Which of the following are the two sources of specifications?
Question22: Which of the following is generally a function of the physical distribution system?
Question23: Projected available balance is calculated in which one of the following ways?
Question24: Which of the following is an advantage of VMI?
Question25: Who is responsible for meeting the minimum specifications of the product design?
Question26: and products made. depends on the design of the product and the mix of the
Question28: A simple system that signals the need for more products is known as:
Question32: A routing file should contain the following information EXCEPT:
Question38: Forecasted Actual
This forecast performance is best described as:
Question39: The step for preparing MPS is/are:
Question43: Which of the following is NOT the manufacturing lead time?
Question44: The formula to calculate the Inventory turns is:
Question46: Which forecast performance measure detects bias?
Question50: Which of the following is NOT categorized modeling approaches in SCM?
Question52: Which of the following is an artificial grouping of components for planning purposes?
Question55: Engineering drawings and specifications and bill of material are the methods of:
Question57: Life cycle approach for identifying order winners and qualifiers is complicated in that:
Question60: Physical distribution contributes to:
Question61: This figure shows that:
Question63: What can affect the trend, seasonality, or randomness of the actual demand?
Question65: Each of the following actions would reduce safety stock levels EXCEPT:
Question66: The level of detail in strategic business plan is:
Question67: The planning horizon is usually and is reviewed perhaps .
Question69: The specific way in which materials move depends upon which of the following factor?
Question70: For each product
how the product is made.
Question75: Goods or services satisfy the needs and expectations of the user, this refers to:
Question77: Annual cost of pacing orders and annual cost of carrying inventory, together forms:
Question79: is the sum of queue, setup, run, wait and move times at work center.
Question80: A planned order receipt is generated by MRP when:
Question82: Multilevel bills are formed as:
Question84: is the most detailed, complete and accurate of the capacity planning techniques.
Question85: Using non-cumulative methods, what is the ATP in period 1?
Question87: All of the following are ways to achieve financial objectives EXCEPT:
Question88: Government regulations majorly apply to areas as:
Question91: Order winning characteristics are defined primarily from:
Question92: Which of the following is NOT the dimension to quality measurements?
Question93: Repetitive Manufacturing and continuous manufacturing are types of:
Question94: What occurs when the cost of ordering equals the cost of carrying?
Question95: Planning horizon means
Question99: What is needed for items and is associated with master production scheduling?
Question100: There are following reasons of using sample inspections:
Question103: An open order appears as a/an on the MRP.
Question104: Capacity planning links the various production priority schedules to :
Question106: Which of the following is the activity of Demand management?
Question107: How many types of demand are in Material Requirements planning?
Question109: The process capability index combines:
Question121: The cost of avoiding trouble by doing the job right in the first place is known as:
Question122: Basic strategies that can be used in a production plan may be:
Question124: Inventory investment can be balanced with:
Question126: Which combination of business processes is accurate?
Question127: Following is an example of:
Question129: The tracking signal can be calculated as:
Question131: The information needed to develop an MPS is provided by:
Question133: The safety stock required depends on which of the following:
Question134: Important way to resolve conflicting objective is:
Question135: Which one of the following affects capacity available?
Question136: Scheduled receipts shows:
Question142: Production activity control in intermittent manufacturing is complex Because of:
Question145: Owner's equity is:
Question147: The available time depends on the number of machines, number of workers and:
Question156: is an internal net that is normally used within the boundaries of a company.
Question162: Exploding is the process of multiplying the requirements by:
Question164: To detect the presence of assignable causes of variation is the objective of:
Question165: What is the rule for forecasting with seasonality?
Question177: Basic concepts in TQM:
Question178: _ is the delivered cost of a product to a particular geographic point.
Question179: Which one of the following should be the result of capacity requirements planning?
Question181: Each active manufacturing order has a record in which file?
Question182: Based on material flow, processes can be organized in which way?
Question185: Planned order receipt is generated by MRP when:
Question186: Which of the following are the major objectives of Material Requirement Planning?
Question194: Inventory Record is one of the major input to the
Question195: In MPS, plans are reviewed and changed:
Question196: Which of the following is/are the major characteristic/s to flow manufacturing?
Question197: What are purchased items received that have not entered the production process?
Question202: To order exactly what is needed, no more, no less, this rule is called:
Question203: Work done at each workstation should take about the same time, this is called: