EMT Practice Test

1. Question Content...


Question List

Question1: In which activity of the testing process is the scope of performance testing established?
SELECT ONE OPTION

Question2: Associate each type of performance test (listed from 1 to 5) with part of a description that allows its characterization and/or identification (listed from A to E).
1. Endurance testing
2. Scalability testing
3. Capacity testing
4. Stress testing
5. Concurrency testing
1. Type of testing focused on the ability of a system to meet future efficiency requirements.
2. Type of testing used to evaluate a system's ability to handle reduced availability of resources.
3. Type of testing focused on the stability of the system over a specific time frame.
4. Type of testing used to determine the number of transactions a given system will support while still meeting established performance objectives.
5. Type of testing focused on the impact of situations where specific actions occur simultaneously.
SELECT ONE OPTION

Question3: What is the benefit of transaction nesting for performance testing?
SELECT ONE OPTION

Question4: Which ONE of the following options represents a principle of performance testing?
SELECT ONE OPTION

Question5: Choose the option that BEST describes valid opportunities for the dynamic performance testing.
SELECT ONE OPTION

Question6: If George is testing in order to check the stability of a system for a specific period of time in an operational system context, what type of testing is MOST appropriate?
SELECT ONE OPTION

Question7: ich ONE of the following options is a specific performance risk in mobile applications?
ONE OPTION

Question8: Which ONE of the following mechanisms is used to make the load test represent a load situation in a real production environment?
SELECT ONE OPTION

Question9: Choose the MOST suitable description of the structure of a performance test script SELECT ONE OPTION

Question10: Identify the correspondences between the aspects (listed from 1 to 4) and factors to be considered (listed from A to D) when selecting performance testing tools.
1. Compatibility.
2. Scalability.
3. Understandability.
4. Monitoring.
1. Level of technical knowledge needed to use the tool.
2. Correlation of the monitoring with the defined transactions.
3. Protocols.
4. Ability to generate load from multiple points of presence.
SELECT ONE OPTION

Question11: (REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
* Natalie should make a presentation to the technical stakeholders In order to explain the performance test plan.
Question
Which ONE of the following options contains information that should be included in Natalie's presentation to the technical stakeholders?
SELECT ONE OPTION

Question12: In which activity of the testing process is the scope of performance testing established?
SELECT ONE OPTION

Question13: In this question, consider that test scripts are generated from a protocol level recording. At the end of the recording, an attempt was made to execute the recorded scripts without any processing, and it was not possible to play them back.
Question
What could be the reason why it is not possible to play back the script?
SELECT ONE OPTION

Question14: Given the following list of approaches to load generation, select the load generation approach that is LEAST reproducible and accurate.
SELECT ONE OPTION

Question15: If Emily is conducting a performance test to determine that a system exposed to a load can respond to a high number of concurrent users during short periods of time that occur on specific days and at specific times, and then return to a stable state.
What type of performance testing is Emily conducting?
SELECT ONE OPTION

Question16: (REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2. you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
* Natalie should make a presentation to the business stakeholders In order to explain the performance test plan.
Question
Which ONE of the following options contains information that should be included in Natalie's presentation to the business stakeholders?
SELECT ONE OPTION

Question17: Base Scenario 1: This Base Scenario 1 is used for 2 questions throughout this exam. When you refer to Base Scenario 1, you are referring to this description and only this description, without any modification.
k given project for the development of a management software that will have a multilayer architecture will enable Its users to Install it in multiple locations, nationally and internationally - each installation can operate Independently and communicate with other instances in a selective way. Each installation shall have a high processing capacity.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
* The project follows a sequential development life cycle model.
Question
Which is the right moment in the project to analyze and evaluate the performance risks?
SELECT ONE OPTION