Question1: Your CEO was fired because of a decline in the company's profits by the Board of Directors. They have now hired a new CEO, who plans to re-shape the portfolio and has changed the company's strategic goals and objectives. The new CEO will continue the existing product line of soap products that the company has manufactured for the past 50 years but now will manufacture new products to focus on the baby boomer generation as they retire but desire to maintain a youthful appearance. It also will offer other products to new high school and college graduates who want to appear older. As the portfolio manager you should:

Question2: Your company's water treatment center serves three cities. Tests are conducted each day to see if the water is safe to drink. On Thursday, E coli were found in the water, but the water authority did not notify the citizens in the three cities. Instead, the citizens learned on Friday, the water was now safe to drink. The citizens are in an uproar, and your company is to blame. It is obvious one of the problems is the aging infrastructure and limited resources. To best optimize the portfolio, your CEO asked you to:

Question3: Based on the data in the following table, your organization should pursue which component:

Question4: Chartering a portfolio is a major step in getting the needed authorizations to execute the portfolio. Your are currently developing the charter and considering the following inputs

Question5: You are managing a portfolio in a functional organization and resources are shared between operations and projects. You are continuously performing capability and capacity analysis in order to optimize the portfolio.
Which of the following capability and capacity analysis is used to limit the number AND size of components the organization can execute?

Question6: Chartering the portfolio is an important step towards the initiation of the endeavor. It authorizes the portfolio managers to use the resources and marks the first step towards the allocation of resources to the components upon their initiation. Which of the below can help you while developing the charter?

Question7: You are managing a portfolio linked to multiple business units and you set clear roles and responsibilities from the beginning to avoid delays and to enhance the decision making process. An unanticipated issue occurred last week, which relates to one of your team members missing to check the market fluctuating currency. In which of the following documents should you look to know which member was responsible of this?

Question8: When it comes to change, one of your junior portfolio managers came to you requesting your help to deal with the overwhelming strategic changes. He wants your assistance in solving the issue of continuous changes in the organization's objectives. What should be your advice to him?

Question9: Along the course of the portfolio, you will be recommending the initiation, termination and update of components. The governance bodies will be approving or rejecting your recommendations as part of their role in the authorization of the portfolio. As a portfolio manager, which of the following, in your opinion, is the objective/purpose of the Authorize Portfolio Process?

Question10: Which of the following is NOT considered as a criteria for prioritization?

Question11: Consider you are a veteran portfolio manager and that you are managing the most important portfolio in your company. What are the processes you execute as part of the portfolio governance?

Question12: The governance board has an integral part in the realization of the portfolio strategic value. In your opinion as a portfolio manager, Governance board decisions are based on

Question13: The sponsor came to you asking for a high level timeline to depict the approach that you will take to execute this portfolio. What tools and techniques is useful in your case?

Question14: After a strategic change is managed and finalized, you as a portfolio manager, are expected to document changes to the portfolio components attributes. Which of the following is the document in which you document these changes?

Question15: In a portfolio you have a continuous interaction between the portfolio and its components. You have to follow a lot of processes and procedures in order to reach a satisfactory result. In your opinion as a portfolio manager, who guides the portfolio team to follow the processes, metrics, and other procedures in the portfolio?

Question16: A portfolio manager needs to continuously balance the need and requirements with the available resources to maintain a balanced portfolio and portfolio resources in order to optimize delivery, in addition to managing communication, risk, etc. For this you develop a robust Portfolio Management Plan. Which of the below is not a part of this plan?

Question17: Assume you are the portfolio manager for a public sector organization, and it has been part of a public-private partnership for three years for highway projects. You are making recommendations as to the next program to undertake. The head of your Highway Department in your State is questioning whether the partnership is the best approach or whether it is best to work on its own. You asked the Marketing manager for assistance, and she prepared a value-for-money analysis. This approach is useful in that it:

Question18: You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a tight schedule, a large number of stakeholders including the public, in addition to a strict budgeting framework, you know that you will be managing the communication closely and that the governance board and the stakeholders would want to check on the progress and performance frequently. For this you have developed a robust Communication management plan. What is the result of developing this plan?

Question19: A portfolio includes a lot of independent components with the same strategic aim. As a portfolio manager you will need to preare a qualified list of components to be used to reach the strategic goals and objectives. What input can you use in order to define the mix of portfolio components?

Question20: As a portfolio manager, you map the business value areas to each component in your portfolio in order to maintain alignment with the organizational strategy. What is the mechanism that will be used for tracking areas of measurement for assessing how the mix of portfolio components is performing?

Question21: The Portfolio Management Plan is an important document that is referenced throughout the portfolio life cycle. Which of the following is correct regarding the Portfolio Management Plan purpose and focus?

Question22: Manage supply and demand comes down to balancing the requirements with what is available. Resource requirements are a major input to the manage supply and demand process. Which of the following inputs to this process contains resource requirements?

Question23: Assume you are working to prepare the low-level schedule and timelines for portfolio components. You want to make sure, as the portfolio manager, for your country's initiatives to promote an awareness of the importance of climate change, that each component then can be monitored and tracked to assess performance.
To do so, you should:

Question24: You are the portfolio manager for a family business company who had an old CEO reluctant to change and to taking risks. The board has decided with the support of the president to change the CEO and assign a new one.
The executive directors along with the president have as well advised the new CEO to be more aggressive.
Which of the following documents need to be updated in this case?

Question25: As a portfolio manager, you have been reporting the progress, status and performance regularly and you have been doing a good job so far. Reports are the primary documents to communicate portfolio status and be able to balance the mix of portfolio components to best align with objectives. When it comes to optimizing a portfolio, how can risk reports be used?

Question26: As part of the strategic alignment, you Identify prioritization criteria (e.g., legislative, dependencies, ROI, stakeholder expectations, strategic fit) using information gathering and analysis techniques in order to

Question27: Your sponsor is under a lot of pressure from the management because the portfolio has been hit by multiple risks already and the situation is going towards its termination. Your sponsor asked you to prepare him an analysis to show the probable ROI and the confidence level in it. Which approach is the best one in this case?

Question28: You have been assigned as a consultant to give your expertise on a failing portfolio which is critical to the success of your client's organization. You are now in the process of reviewing the portfolio management plan.
What do you expect to see as part of this plan?

Question29: You have just recommended the Portfolio Strategic Plan and Portfolio to the governance board for approval.
The portfolio board members informed you that they did not find what they were looking for in the strategic plan and that it needs to be reworked. What should have been part of your Strategic Plan?

Question30: You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. You are currently in the process of identifying and analyzing risk, in addition to developing risk responses and monitoring and controlling risk. Which documents can help you achieve this?

Question31: There was a change in your portfolio to speed up things resulting in the addition of new components. In order to update the new vision, dependencies and timeline for the components, you should update which of the following?

Question32: One of your portfolio team members is confused on the reason behind using the three processes: Define Portfolio, Optimize Portfolio, Authorize Portfolio and Manage Portfolio value. For him, we can skip a couple of processes. He came to you for advice. What should be your response to him?

Question33: Stakeholders in your company are skeptical of the changes that will occur as portfolio management is being implemented. While some are supportive, most are not as they believe their work may be terminated. As the portfolio manager, you prepared a list of stakeholders, which is included in the:

Question34: Over the years, your organization has grown significantly as it has entered new markets while maintaining its presence in its traditional product line of security systems. The company now has eight different business units rather than three, which was the case only two years ago, and it set up funding originally such that it was only allocated to one business unit and could not be transferred to others. At the recently held Portfolio Oversight Committee meeting, five business units did not add components, but some were completed. The other three added a number of programs and projects, which were authorized. Now funding for these new components is an issue. This means:

Question35: Portfolio managers tend to use the efficient frontier analysis as a modeling approach that gives decision makers the analytical tool to optimize portfolios given resource constraints such as risk. In which of the Portfolio management processes the efficient frontier is mostly used

Question36: Portfolio managers tend to use the efficient frontier analysis as a modeling approach that gives decision makers the analytical tool to optimize portfolios given resource constraints such as risk. Consider that your company is risk-averse, on which side of the efficient frontier curve should the undertaken portfolios lie?

Question37: As part of the Portfolio Communication, the Portfolio Manager analyzes the raw data assimilated from the portfolio process assets and from the stakeholder analysis. This analysis aims to isolate the data that hold value to the receiving audience. Which tool can the portfolio manager use to help him in performing this analysis?

Question38: The Strategic Plan is an important document that is referenced throughout the portfolio life cycle. Which of the following is correct regarding the Strategic Plan purpose and focus?

Question39: Stakeholders are concerned about the purpose of optimizing a portfolio while already having defined the portfolio with its related components, and are worried that this will cause a lot of time to be wasted. What is your advice to the stakeholders?

Question40: A portfolio manager needs to continuously balance the need and requirements with the available resources and needs to maintain a balanced portfolio and portfolio resources in order to optimize delivery. Capability and Capacity analysis is performed in 4 of the portfolio management processes and it serves a slightly different purpose in each and every one of them. When it relates to developing the performance management plan, what is the purpose of using this analysis?

Question41: A portfolio manager on one of the major sub-portfolios in your portfolio has tendered his resignation and gave you a 2 months notice. This unexpected change will require you to take immediate action with the governance board. Which of the following processes will be handling this situation?

Question42: Although it has taken significant time, you and your team inventoried all the work under way in your new product development company. This list of components should be:

Question43: As a result of optimization, one of the components was deemed necessary to be terminated. One of the executive managers found about this and called you telling you that you should leave this component as it is of interest to her and she wants to see it finalized and that she will make resources available to it if needed. What should be your best course of action?

Question44: As you work to determine which of four possible components to optimize the portfolio, assume you are using the internal rate of return as the key crite rion to make your recommendation. Only one new component can be added based on financial constraints. Each of the four potential components has benefits that support the strategic plan. Based on the following data, you recommend:

Question45: You are managing a portfolio for a major car dealer in the region and due to diversity of locations, funding terms and your client's corporate structure, you have a big number of components to be included in the portfolio. With such a huge number, you need to prioritize the components in order to prepare the mix of components to execute. Where can you find the prioritization model?

Question46: Stakeholders are an integral part of the portfolio. The portfolio manager will work with the stakeholders to plan, execute and eventually deliver and close the portfolio. While developing the performance management plan, the portfolio manager plans a series of sessions with key stakeholders to define Key Performance Indicators (KPIs). What are these sessions collectively referred to in a portfolio?

Question47: Portfolio Governance Model is developed as part of the Portfolio management plan and defines the way the organizational assets and resources are planned to be managed within the portfolio according to the specific environment of the organization. Which of the following is correct regarding the Governance Model purpose and content?

Question48: You are a portfolio manager for a company with volatile market conditions and continuous strategic changes.
It is always important for you to use methods such as simu-lation techniques, flowcharts and decision trees to be able to balance the portfolio with the actual needs. Which of the following tools and techniques you are using in this case?

Question49: Your company is currently on the verge of bankruptcy due to the lack of transparency within the organization; this alerted the CEO to take decisive actions and request that new reporting lines be established in order to be fully transparent. Following this, the portfolio structure has changed to cope with the new reporting lines.
Where is this change reflected when it comes to portfolio documents?

Question50: Assume you are creating a roadmap for your portfolio and will present it to key stakeholders and then to the Portfolio Review Board. You realize you will be adding additional detail to it, but you also believe its graphical format will be useful. In developing it, you decide to reference prioritization, dependencies, and organizational areas so you should consult the:

Question51: Aligning the portfolio with the strategic objectives starts by developing the Portfolio Strategic Plan. You are currently developing this plan and are looking for a document that provides you long-term direction. What are you looking for in this case?

Question52: Initiatives in the companies aim to deliver values. For a portfolio, the value is delivered through a mix of components with similar strategic goals and objectives. Multiple components can contribute in the realization of the same organizational value. While managing the portfolio value, how do you depict the relationships between components in achieving value?

Question53: Your team members were having a discussion about the contents of the Portfolio Charter and they came to you for advice because they could not agree on a common answer. What would be your advice to them?

Question54: You are managing a portfolio in a functional organization and resources are shared between operations and projects. You are continuously performing capability and capacity analysis in order to optimize the portfolio.
Which of the following capability and capacity analysis is used to limit the number OR size of components the organization can execute?

Question55: You have been asked to be the manager for a governmental portfolio, and your starting point should be tendering a strategic plan to the board for validation and approval for continuation. Which documents/artifacts do you have debuting the portfolio that you can use to develop the strategic plan?

Question56: The Portfolio Management Office (PMO) provides support to the portfolio manager throughout the portfolio life cycle. Which of the below is not something that the PMO supports the portfolio manager with?

Question57: You are managing a highly technical portfolio and are already mid-way through the implementation. You know that the communication is key to success as all the involved parties and stakeholders have a high technical exposure and you should maintain their buy-in along the lifecycle. Part of your activities is to collaborate with stakeholders to reach a common ground and to resolve conflicts. Which of the following is considered a collaboration technique?

Question58: Roadmaps may be prepared to show different elements, and at the beginning they may not provide details of the various components. As a high-level plan at the portfolio level, the roadmap:

Question59: Portfolio Governance is important in a portfolio to maintain correct alignment, monitor and control performance and status, reshuffle the mix of components as found necessary, etc. Governance management includes which of the following processes?

Question60: In managing strategic change, the portfolio manager performs stakeholder analysis in order to consider the changing requirements. Which of the following options is referenced in this case to provide guidance on the communication required to ensure successful change?

Question61: As you prepare a list of possible components for your railroad to consider since most of its programs and projects are large and complex, your management team has suggested in your analysis of which components to pursue that you conduct statistical simulations of budgets, schedules, and resource allocations. You therefore decide to use:

Question62: In order to guide the work and correctly manage the portfolio, one of the major documents to be prepared is the Portfolio Management Plan acting as guideline for portfolio management. What are the tools and techniques you could use while developing this plan?

Question63: You are the manager of a major portfolio with a variety of stakeholders and stakeholder groups. you know that managing communication is key to success and you stress on maintaining a high communication level. You have just finalized the development of the Portfolio Communication Management Plan. Which of the following is correct regarding its purpose and focus?

Question64: Assume you are the portfolio manager for your training company. It decided to implement portfolio management in a major way to ensure it remained competitive in the changing market and could offer a variety of methods to deliver courses rather than only in a face-to-face setting. The company set up a Portfolio Management Group, and you are responsible for providing information on portfolio status and then providing information to those interested stakeholders about the Board's decisions. You want to make sure the reports meet stakeholder requirements. After performing a detailed communications requirements analysis, you found it interesting that stakeholders wanted information about:

Question65: You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. You are currently in the process of developing the risk management plan.
Which of the following activities will you be performing?

Question66: As a portfolio manager you visit and re-do the Optimize Portfolio process continuously. Which of the following, in your opinion, is the objective/purpose of the Optimize Portfolio Process?

Question67: You are currently creating portfolio scenarios (what-if analysis) by reviewing components against prioritization criteria and using analysis techniques (e.g., options analysis, risk analysis, SWOT analysis, financial analysis). You are doing this in order to

Question68: Since you work for a global aerospace and defense organization, it decided to pilot the implementation of portfolio management in its cargo aviation business unit. You were asked to lead this initiative and realized before you could proceed, you should find out information about all the existing projects, programs, and operational activities. This task took three months to complete, but with this list, you now can use it to set up categories for the work that is under way and to also define criteria to use to propose new components. As a result you should:

Question69: Stakeholders expectations and requirements change throughout the portfolio life cycle. New stakeholders can be added or removed and requirements need to be continuously solicited in order to keep the portfolio aligned with stakeholders expectations. What is the process for soliciting requirements called?

Question70: Your executive management has been recently undergoing a change from a functional organization to a projectized one and is currently assessing the volume of work that the organization can execute. Which of the following tools and techniques will decide the volume of work and components that the organization can execute?

Question71: Assume the organization's strategy has undergone a significant change, and as a result the mix of components in the portfolio also will change. As the portfolio manager, you need to update your charter in order to reflect:

Question72: You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. The Portfolio Process Assets are important and referenced throughout the portfolio life cycle. Which of the following is correct regarding the Portfolio Process Assets purpose and focus?

Question73: Portfolios have a lot of components in them and are executed along an extended lifecycle. For this, as a portfolio manager, you continuously monitor and control the progress and status. What input can you use to help you with this?

Question74: A portfolio manager needs to continuously balance the need and requirements with the available resources and needs to maintain a balanced portfolio and portfolio resources in order to optimize delivery. Capability and Capacity analysis is performed in 4 of the portfolio management processes and it serves a slightly different purpose in each and every one of them. When it relates to managing the supply and demand , what is the purpose of using this analysis?

Question75: Strategies are changing, the portfolio mix is changing, the portfolio is progressing and you are doing a great job optimizing the mix of components. What tools and techniques are you using in the case?

Question76: You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You are currently defining the portfolio and with the purpose of

Question77: As a portfolio manager, you realize the importance of communication for the success of a portfolio. You are now developing the portfolio management plan and are looking for the portfolio current risks status including high risks. Which of the following contains what you are looking for?

Question78: You have been managing multiple portfolios in your company for the past two decades and all deliveries were successful. A new portfolio manager is struggling and came to you for advice on the portfolio process groups.
He knows that portfolio process groups are the base of portfolio management. While you explain to him about them, you told him that portfolio process groups are independent of

Question79: Each time a strategic change occurs, it requires a number of updates, and it includes the need to update the portfolio process assets including:

Question80: You are the portfolio management for a big corporate with existence in 3 continents. While planning the performance management and in particular the dashboards and reporting tools, which of the following options is the most important to account for the different geographical locations?

Question81: A big strategic change occurred at the organization level and has impacted multiple portfolios in the organization including yours. The sponsor has asked you to analyze the change and update the needed documents. You managed this change and are currently updating the Portfolio Management Plan. Which of the following are part of this update

Question82: Assume you have determined the prioritization criteria your Portfolio Review Board will use, and you have reviewed the criteria with your key stakeholders to attain their buy off and occurrence. The purpose in establishing these criteria is to:

Question83: In identifying risks to then manage and control, as the portfolio manager you are consulting organizational process assets such as:

Question84: You have been assigned as the manager for a major transformation portfolio in your company. You are acquiring the position due to the failure of the previous manager and the strategic importance of the portfolio.
You start by consulting the portfolio strategic plan. What do you expect finding in that plan?

Question85: Establishing a portfolio management process starts with the development of the organizational portfolio management implementation plan. Which of the following helps while developing this plan?

Question86: Working to prepare the portfolio performance management plan, assume you have been involving others in the process to help secure their later support of the plan. You also reviewed historical information and other artifacts. Not to be overlooked is a/an:

Question87: Risks perspectives differ within the organization between executive management, operations management, portfolio management and project/program management. Which of the following are common risk concerns across the organization?

Question88: While managing a program for the banking sector spanning multiple transformational areas. A new portfolio manager comes to you seeking advice on the usefulness of ROI. You tell her that ROI is the best method to measure returns of

Question89: Assume after the acquisition of the natural gas transmission company by your company, a natural gas distribution company, was approved by the various regulatory agencies. You now are overseeing more components with this acquisition as the portfolio manager. While you had each of the components in your company set up in various categories, this approach had not been followed by the transmission company. You explained to its portfolio manager and staff such an approach enables:

Question90: Assume your telecom company is time constrained and needs to be first to market with new smart phones with features that are different from those of the competition and also have the traditional features desired by your existing customers. The Portfolio Review Board meets weekly to assess performance and to consider new components. Lack of technical resources is a recurring issue. To make the case for acquiring new resources, you decided to assess capability and capacity. This approach is:

Question91: You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a tight schedule, a large number of stakeholders including the public, in addition to a strict budgeting framework, you know that you will be managing the performance closely and that the governance board and the stakeholders would want to check on the progress and performance frequently. For this you are developing a robust performance management plan. What can you use to help you start developing this plan?

Question92: A major strategic change has occurred and you are managing the change at portfolio level. You are currently performing gap analysis and you receive information on a stakeholder that is extremely unhappy with how the change will be handled in your portfolio. What should be your best course of action?

Question93: You are currently defining a hierarchical representation of your portfolio and its components and listing the major and milestone components, including dependencies internal and external to the portfolio with business units. For this you know that you will need multiple inputs. Which of the following are considered inputs in your case?

Question94: Organizations pass by a strategic planning cycle on regular basis in order to align existing strategies, remove strategies and add new ones. When it comes to the implementation, which of the following options represents the activities through which the organizational strategies are implemented?

Question95: Due to market technological changes, your company got impacted and was urged to revise its portfolios. You are currently revising your portfolio to determine the required changes in the component mix. Which of the following options helps in comparing the current portfolio mix to the new strategic direction in order to determine the needed changes?

Question96: Multiple communication methods are used by the portfolio manager in order to proactively convey messages and engage the stakeholders at the right time and in the right manner. Which tool is used to visually convey multiple messages at the same time?

Question97: Each portfolio risk should have a designated person as its owner. As the portfolio manager assigns the owner, the main responsibility is to:

Question98: Assume you recently were hired to be the first portfolio manager at the leading producer of soft drink beverages. While the company is well known for one product, it wants to be the leader in other products and services as well. When you were hired, you told the CEO it would take time to fully implement portfolio management, and you first would prepare a number of artifacts. He set up a Portfolio Review Board, and its members are reviewing your work. As they reviewed the portfolio management plan, one of the members suggested you prepare an in-depth portfolio performance plan. Your first step is to:

Question99: Your probability and impact assessment work is complete, and you are using the results to prepare the portfolio risk management plan. As you do so, it also is useful to:

Question100: A junior Portfolio manager has come to you for advice. He is hearing a lot about the focus of portfolio management practices, however, he is not sure anymore of the exact answer. What do you, as an experienced portfolio manager tell him?

Question101: Assume you are managing your city's portfolio, and its overall strategic goal is to promote economic development to attract more visitors to the city. It is a difficult challenge as the city is not a major metropolitan area and also is not a preferred winter or summer destination. Nonetheless, you are planning and allocating resources according to the city's strategy. Not to be overlooked as you do so is the need to:

Question102: You are working diligently to ensure people throughout the organization realize the importance of portfolio management. To do so, you are preparing a communications strategy. When you distribute it, you will be able to show you can satisfy information requirements in order to:

Question103: Portfolio management processes are performed in an environment broader than a portfolio; therefore, an organization-level implementation team supported by executive management, a governing body, and portfolio managers join forces to implement organization-level portfolio management processes. After Defining roles and responsibilities for portfolio management process implementation, what should be the FIRST next step?

Question104: In your architectural organization, each program or project requires some specialized subject matter experts at certain time frames. Because of the interdependencies between components, often these SMEs are needed at the same time. Assume since this is a critical issue in the company, it invested in resource planning and allocating software, and dashboards can be prepared. The goal is to use these dashboard reports to:

Question105: Your organization is considered a leader in knowledge management and has a Chief Knowledge Officer reporting to the CEO. It also implemented portfolio management eight years ago. As the organization focuses on continuous improvement and transformational leadership, it had an external consultant review its portfolio artifacts and do some benchmarking. One of the consultant's recommendations was to update the portfolio risk management plan since the company is embracing new and complex technology in much of its work. In updating this plan, it was useful to:

Question106: Portfolio Prioritization Model is included in the Portfolio management plan and Portfolio Strategic Plan. How does it serve the Portfolio as part of the Portfolio Strategic Plan?

Question107: You have a portfolio component that is using earned value analysis. It is at the 15% point of completion, and it is evident that it cannot be completed as planned. Adding resources will not solve the problem, and at the last Portfolio Review Board meeting, the Board members decided to terminate this component based on its various risks. They then decided the resources allocated to this component could be transferred to other portfolio components enhancing their early completion and avoiding risks from competitors. As the portfolio manager, you:

Question108: Assume it was your suggestion to the executive team as the newly appointed Chief Financial Officer for your organization to implement portfolio management. While someone has been identified to be the portfolio manager, you are developing the charter and the structure. In doing so, guidance is provided by the:

Question109: Managing risk is key to the success of any initiative. Risk is considered to be inherent in any activity we do in project management and at any level. As part of managing risks, the portfolio manager applies multiple analyzes and uses tools to help dealing with risks. What does the portfolio manager use to visualize risks impact on portfolio strategic objectives such as profitability?

Question110: You have scored the portfolio components and are analyzing the data in order to prioritize the components.
Using the following scoring table, which of the options represents the correct Components Priority? Taking into consideration that the costs for each component is Component A: 10 K USD, Component B: 15 K USD, Component C: 16 K USD, Component D: 13 K USD and Component E: 11 K USD; The budget for this portfolio is a fixed one of 40 k USD Larger image

Question111: One of the stakeholders of one of your components came to you complaining that his manager is not receiving specific information on multiple components progress. What is your best course of action?

Question112: While Optimizing your portfolio, you need to present to the governance board how your components will be ranked and balanced in a quantifiable way. How will you do this?

Question113: You are managing a portfolio for your company and are trying to balance the tasks that will be done internally based on the availability and the ones that will be outsourced. Managing supply and demand is a recurring activity in the portfolio life cycle and results in changes in resource utilization and resource efficiency. Which of the below helps in optimizing the supply and demand?

Question114: Along your portfolio lifecycle, you have been conducting multiple review meetings to ensure continuation from one phase to another and to ensure the alignment and value delivery, in addition to communicating decisions and valuable information to the related stakeholders. Changes to the approach of portfolio governance may be a result of review meetings. Which of the following options include updates to the governance model?

Question115: Managing risk is key to the success of any initiative. Risk is considered to be inherent in any activity we do in project management and at any level. Risk is incorporated in all process groups as well. As a portfolio manager, how do you map the risk management elements to process groups?

Question116: You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. While planning for risk management, multiple investment choice tools are used as part of the quantitative and qualitative analyzes. Which of the following tools determine the effect of changing the portfolio?

Question117: You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a tight schedule, a large number of stakeholders including the public, in addition to a strict budgeting framework, you know that you will be managing the portfolio closely and that the governance board and the stakeholders would want to check on the progress and status frequently. For this you have developed a robust Portfolio management plan. What do you expect as output of this development?

Question118: A portfolio manager needs to continuously balance the need and requirements with the available resources and needs to maintain a balanced portfolio and portfolio resources in order to optimize delivery. Capability and Capacity analysis is performed in 4 of the portfolio management processes and it serves a slightly different purpose in each and every one of them. When it relates to optimizing portfolio, what is the purpose of using this analysis?

Question119: Companies adopt project, program and portfolio management practices to enable the realization of business value and the achievement of strategies and objectives. In order to advance the organizational capability and facilitate the alignment of these practices, the company should (choose the best answer)

Question120: Recognizing that different components can have different types of risks, you decide to see how each risk affects the components. For example, assume you have identified a structural risk as overly ambitious plans and determine this risk affects three of the top five risks in your portfolio. You also have identified an environmental risk, in terms of whether the component will promote the organization's vision, which affects two components. Each component then has some other types of risks that affect it. From such an analysis you can see:

Question121: As part of the strategic alignment, you Evaluate organizational strategic goals and objectives using document reviews, interviewing, and other information gathering techniques in order to

Question122: By setting up portfolio categories and using a pair-wise comparison approach to rank components, as the portfolio manager, you feel that you are finally setting up and getting people to follow standard portfolio practices. Since portfolio management still is relatively new, progress is under way. As some components are added, and others are not continued, you are making sure if a component is terminated that it does not have dependencies with others in the portfolio. You need to then:

Question123: The portfolio management information system (PMIS) is often a collection of spreadsheets rather than automated tools. An effective PMIS enables the portfolio manager to define, analyze, design, produce, and manage systems to support a successful portfolio. Which of the following is a trait of a PMIS?

Question124: One of your component managers came to you to tell you about a risk affecting his component that will badly impact the component and might affect the portfolio. After assessment, the risk turned out to be of low probability with high impact. What do you do as a portfolio manager?

Question125: Many people in your country are no longer eating food from cans because of the risk of botulism and eColi O1H747. Your low acid canned foods company is seeing its revenues decrease as a result, and it is updating its overall strategy for the company to diversify into other markets as well as to add an aggressive marketing campaign to ensure the public that its low acid canned foods are generally recognized as safe by the Food and Drug Administration. This means in terms of portfolio management:

Question126: You have been recently assigned to manage a new portfolio that is supposed to shift the company from silo-based to a projectized one. You are in the process of initiating the portfolio. You are currently developing the strategic plan. Upon finishing it, you are expected to present

Question127: A portfolio manager needs to continuously balance the need and requirements with the available resources and needs to maintain a balanced portfolio and portfolio resources in order to optimize delivery. Capability and Capacity analysis is performed in 4 of the portfolio management processes and it serves a slightly different purpose in each and every one of them. You are currently using it in the development of your charter. What is its purpose in this case?

Question128: As the portfolio manager in the third largest automotive manufacturer in your country, you have a large number of components especially new vehicles each year but also support for dealers, advertising, maintaining the brand image, increasing market share plus continuous improvement initiatives. You have contingency reserve to use to prepare to handle any risks that may occur, which is based on:

Question129: For governments worldwide, you normally have a lot of people reluctant to change and to using new technology tools especially for communication. You are managing a governmental portfolio and planning for a transformational endeavor. You are currently depicting the various communication media and methods to be used, where is this information normally used?

Question130: In your web app company, the portfolio is constantly changing. It is not unusual for a new proposal to be submitted each day and for other components to be terminated as a competitor was first to market. The Portfolio Review Board usually meets daily in this fast-paced environment as it:

Question131: You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. A major risk has recently occurred and the risk owner came to you asking advise on how to report it. what would you advise her?

Question132: Assume you are the portfolio manager for a company that specializes in software, including portfolio management software. It has many components under way to enhance the existing product line but also to move the company into Cloud computing. You regularly prepare reports on the portfolio status but lately have had a large number of stakeholders request ad hoc reports. You decided to survey your stakeholders to learn about their information needs. You next decided to hold some one-on-one interviews with several interested and influential stakeholders in terms of communications requirements. From these interviews you are concerned that some stakeholder groups may be missing so you decided to:

Question133: Assume you are new to your organization and you were hired specifically to help implement portfolio management in your new manufacturing company. Having worked in portfolio management for the past five years, you know it is a major culture change. It is definitely a challenge at your new company because:

Question134: As part of the annual planning, PMO has started to group initiatives managed under each portfolio in the organization. The collected list will be used in developing the new Portfolio Strategic Plan. What is this collected list called?

Question135: You are managing a portfolio for your company and are trying to balance the tasks that will be done internally based on the availability and the ones that will be outsourced. Managing supply and demand is a recurring activity in the portfolio life cycle and results in changes in resource utilization and resource efficiency. What is the expected outcome from managing supply and demand?

Question136: Efficiency is highly regarded when managing a portfolio and spans all activities i.e. risk management, communication management, etc. A portfolio is considered efficient if it

Question137: After the second shutdown of the Government, your Agency Administrator realized that some essential programs had to continue even during the shutdown, some existing work along with some programs and projects in the pipeline perhaps were not needed, and resources may require reallocation. This example shows the:

Question138: One of the major steps for a portfolio manager is to know which components qualify to be included in the mix of components that will achieve the strategic objectives sought by the portfolio. As a program manager, you will use a variety of methods to help you achieve this purpose. Which of the following are valid tools and techniques?

Question139: One of the major resources on your portfolio is needed by two of the components at the same time. This resource has high technical knowledge and is aware of all the business needs. Which of the following tools and techniques can you use in order to solve this issue?

Question140: A number of components proposals are on the table as a result of the strategic planning cycle. While defining the portfolio, you wanted to use a method to help you compare portfolio components that address similar needs. Which of the following techniques you use?

Question141: When we talk about portfolios, programs and projects, it is inevitable to mention the business value which is the sum of tangible and intangible assets of an organization, also known as the net quantifiable benefit. When it comes to business value, at which level of the organization is the delivery of Business Value optimized?

Question142: Assume you work in new product development, and you believe you have identified a component that will be a breakthrough for the company. However, you performed a capacity analysis with the help of your EPMO to assess resource availability especially in certain skill sets. You learned that key computer scientists required by this component were in short supply, yet you still believe this component should be in the portfolio. To convince the Portfolio Review Board to consider it, you decide to use:

Question143: Due to market technological changes, your company got impacted and was urged to revise its portfolios. You are currently revising your portfolio to determine the required changes in the component mix. Which of the following options is the means to the "to-be" vision?

Question144: Working previously in the financial industry and studying finance and risk in graduate school, you are familiar with Markowitz's Efficient Frontier theory. Now assume you are the portfolio manager for a state government agency. Your agency has a reputation of being risk adverse but given recent budget cuts, you have convinced your executive team it needs to pursue some new programs and projects to demonstrate its benefits to the state.
You decided to apply the Efficient Frontier concepts to show them the current state of its components in terms of risk and associated costs. You explained the portfolio is efficient if it has:

Question145: Your CEO is keen to know the likelihood of the portfolio to realize the expected ROI. You are currently looking for a tool to calculate the probability to achieve portfolio objectives. Which of the following will help you in doing that?

Question146: While there are a number of recommended contents of the portfolio strategic plan, a guiding principle is to:

Question147: The interest, influence, and communication needs of business operational stakeholders who are looking to ensure alignment between portfolio components, while minimizing negative impact and maximizing positive benefits of all portfolio-managed changes to their business operations, relate to which type of stakeholders?

Question148: Your company got recently acquired by another company and the strategic directions which your portfolio is based on have been changed. Which document do you, as a portfolio manager, update to reflect the change to the timeline?

Question149: As you prepare your communications management plan you realize that stakeholder requirements may change over time, and these changes then will need to be reflected in updates to the plan. As the plan defines the overall communication process not only for gathering information but also in determining recipients of it, it also:

Question150: Risk is inherent in all activities and managing risk is critical to a successful portfolio. Risks perspectives differ within the organization between executive management, operations management, portfolio management and project/program management. When it comes to Portfolio management, which of the following is a risk concern?

Question151: Due to multiple occurrences of risk realization, the CEO has asked you to re-assess the portfolio risks once again. Up to what level in the organization do you go when you need to assess risks?

Question152: While planning for risk management, multiple investment choice tools are used as part of the quantitative and qualitative analyzes; which of the following tools determines the effect of changing one or more factors?

Question153: Assume you are co-owner of a small consulting firm. Previously, you worked as a managing partner in one of the larger consulting firms in your country that had a defined portfolio management process to determine key opportunities to pursue to focus not solely on proposal win ratio but to aggressively emphasize capture ratio.
Now in your new company in terms of portfolio management, the best practice to follow is to:

Question154: As the portfolio manager, you must engage stakeholders and build and maintain outstanding relationships with them as much as possible. After identifying and classifying them, you want to make sure you provide the specific information each stakeholder group requires. Therefore you prepare:

Question155: Programs and projects in your company, one of the largest banks in the world, are required to submit metrics as to their individual progress each month. To simplify the collection and reporting process, you held interviews with members of the Portfolio Review Board to see their areas of greatest interest and also with program and project managers to determine how difficult it would be to collect the data. You then selected 10 possible metrics to the Board, with a goal that five would be regularly reported. It is important to note that:

Question156: The Scenario Analysis is used twice as a tool and technique, once while developing the charter and another time while managing Supply and Demand (It also exists as part of the quantitative and qualitative analysis as part of the optimize Portfolio process). When it comes to Manage Supply and Demand, which of the following represents a correct description of the Scenario Analysis?

Question157: You are the manager of a major portfolio with a variety of stakeholders and stakeholder groups. you know that managing communication is key to success and you stress on maintaining a high communication level. As part of the portfolio communication management, multiple documents are prepared in order to effectively manage communications. The Communication matrix is one of the prepared documents, what does it include?

Question158: In preparing your communications matrix, you identified five communication areas. One is portfolio governance decisions. A communication vehicle for these decisions is:

Question159: You have set a meeting with your portfolio team members as an answer to the identification and update of the organization near-term budget and plans. One of your team members asked you of the goal of what is being done. Your answer to him should be

Question160: Your State Governor is fiscally conservative and has limited significantly the financial resources to be provided to each University in the eight Universities in the State's system. Recognizing your University is going to have a 55% reduction in its budget, your Chancellor is re-evaluating all the work that is under way to see how much it can do with fewer resources. Every department will have layoffs at all levels. However, the University does have a portfolio management process in place, which people support. This means for effective portfolio management:

Question161: Your company has multiple portfolios on the way and a variety of different clients and industries. Risk levels are high due to recent governmental regulations and the company has recently been penalized due to a non-compliance to one of the standards. You know that you need to closely managing this. As a result, you will be come out with

Question162: Assume you are responsible for portfolio management in your organization. You are responsible for managing the value of the portfolio and for recommending changes to your Portfolio Review Board to enhance its value.
To do so, you monitor benefits, interdependencies between components, changes, and responsibilities and accountabilities as stated in the:

Question163: You have been recently assigned to a critical portfolio in your company and wanted to start right away and decided to begin with aligning the strategic management of the portfolio to the organizational strategy and objectives. For this you will use

Question164: Your company's new CEO has set an aggressive target and informed everyone that the target needs to be met by all means in order for the company to be able to realize benefits and avoid bankruptcy. What is the best management approach that the portfolio manager should take in this case?

Question165: Due to a strategic change, multiple components on your portfolio have been terminated, leaving you with limited remaining funds coming from the terminated components. What should be your best course of action?

Question166: In a portfolio, data is an abundant asset, and managing the information aiming for a a better decision making is critical. For this you use a variety of Quantitative and Qualitative analysis methods. These methods are performed in 4 of the portfolio management processes and serve a slightly different purpose in each and every one of them. Considering that you are currently working to ensure resource capacity is optimally allocated against resource requirements or demand based on known organizational priorities and potential value, how can you make use of the quantitative and qualitative analysis?

Question167: The portfolio management process ensures the components are aligned to goals. However, it is driven by:

Question168: You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. Risk Categories, criteria and probability and impact are updated as a result of Developing the Risk Management Plan. These updates are recorded in which of the following?

Question169: You are currently in the process of allocating resources to develop component proposals, authorizing components to expend resources and to communicate portfolio decisions. What do you expect as outputs of this process?

Question170: When managed correctly, the balanced scorecards can change the way an organization does business.
Balanced scorecards keep focus on results. As a portfolio manager, you know that the purpose of using the balanced scorecards is

Question171: Various people are responsible for communications to different stakeholder groups, both internal and external to the organization. These delegations of authority are:

Question172: You are the manager of a major portfolio with a variety of stakeholders and stakeholder groups. you know that managing communication is key to success and you stress on maintaining a high communication level. You want to start developing your Communication Management Plan and are planning to use

Question173: While managing portfolio value, you met with stakeholders and discussed how to address the strengths and weaknesses in order to ensure benefits are comprehensively and holistically taken into consideration. Which of the following tools and techniques are you performing?