Question1: You are managing a portfolio for your company and are trying to balance the tasks that will be done internally based on the availability and the ones that will be outsourced. Managing supply and demand is a recurring activity in the portfolio life cycle and results in changes in resource utilization and resource efficiency. Where is this type of results normally found?
Question2: Managing value is key to success as portfolio are undertaken to ultimately deliver an outcome that is strategically aligned and which delivers value to the organization. While managing value, the portfolio manager invokes the Benefits Realization Analysis activity. Which of the following is part of this activity?
Question3: The portfolio strategic plan should contain a prioritization model or approach that guides the ongoing decisions as to which portfolio components should be added, terminated, or changed, as well as prioritizes and balances the component mix over time. A simple prioritization model may be provided which contains
Question4: The Portfolio Management Plan is an important document that is referenced throughout the portfolio life cycle. Which of the following is correct regarding the Portfolio Management Plan purpose and focus?
Question5: Risk Management is integrated in all the other processes and process groups and is an integral recurrent activity throughout the portfolio life cycle. Which of the following is considered an external risk that can affect the portfolio?
Question6: Due to strategic changes, one of the sub-portfolios in your portfolio has been decided to be canceled because it no longer meets the new market demands. What is your next step as a portfolio manager?
Question7: While defining the portfolio, a portfolio manager does a preliminary comparison of all inventoried portfolio components against the portfolio component definition. For this, the descriptors of each portfolio component are used in order to compare it to other components. Which of the following is not a component key descriptors?
Question8: Assume you have determined the prioritization criteria your Portfolio Review Board will use, and you have reviewed the criteria with your key stakeholders to attain their buy off and occurrence. The purpose in establishing these criteria is to:
Question9: You want to ensure that the Portfolio Review Board is able to make key decisions at each meeting. As the portfolio manager, you and your staff are responsible for scheduling the meetings, providing the agenda, taking minutes, tracking open issues, and documenting and communicating decisions that are made to key stakeholders. Before each meeting, you feel it is a best practice to:
Question10: Assume it was your suggestion to the executive team as the newly appointed Chief Financial Officer for your organization to implement portfolio management. While someone has been identified to be the portfolio manager, you are developing the charter and the structure. In doing so, guidance is provided by the:
Question11: You have been asked to manage a major portfolio in order to salvage the company and and re-align it with the strategic objectives and goals. You decided to develop the strategic documents and are currently developing the charter. As a portfolio manager, which of the following would be your answer when asked of the purpose for the development of portfolio charter?
Question12: While managing portfolio communications, the portfolio manager needs to account for the communication needs of the component teams in order for them to stay in the loop of the big picture. Which of the following can be of interest to this group of stakeholders?
Question13: One of your component managers has submitted his resignation and left the company; a new program manager joins the portfolio replacing him. Which document you use to inform the new program manager about his responsibilities in the portfolio?
Question14: One of the junior portfolio managers learned that she needs to perform organizational structure analysis as part of the portfolio management plan development. She does not understand why and she came to you for advice.What is your advice to her?
Question15: The interest, influence, and communication needs of business operational stakeholders who are looking to ensure alignment between portfolio components, while minimizing negative impact and maximizing positive benefits of all portfolio-managed changes to their business operations, relate to which type of stakeholders?
Question16: Based on the data in the following table, your organization should pursue which component:
Question17: One key artifact to review as the portfolio communications management plan is prepared is the:
Question18: Two functional managers within your portfolio are arguing about one scarce resource, and each one is claiming that the resource should be assigned to them. What should you do as a portfolio manager in order to solve this issue?
Question19: You have already created portfolio scenarios (what-if analysis) by reviewing components against prioritization criteria and using analysis techniques (e.g., options analysis, risk analysis, SWOT analysis, financial analysis).You now want to recommend portfolio scenario(s) and related components, based on prioritization analysis/criteria. You are doing this in order to
Question20: As a portfolio manager you visit and re-do the Optimize Portfolio process continuously. Which of the following, in your opinion, is the objective/purpose of the Optimize Portfolio Process?
Question21: A portfolio manager needs to continuously balance the need and requirements with the available resources to maintain a balanced portfolio and portfolio resources in order to optimize delivery. Capability and Capacity analysis is performed in 4 of the portfolio management processes and it serves a slightly different purpose in each and every one of them. When it relates to developing the charter, and in order to complete the portfolio structure, the capability and capacity analysis is used to
Question22: The sponsor came to you asking for a high level timeline to depict the approach that you will take to execute this portfolio. What tools and techniques is useful in your case?
Question23: Recognizing that different components can have different types of risks, you decide to see how each risk affects the components. For example, assume you have identified a structural risk as overly ambitious plans and determine this risk affects three of the top five risks in your portfolio. You also have identified an environmental risk, in terms of whether the component will promote the organization's vision, which affects two components. Each component then has some other types of risks that affect it. From such an analysis you can see:
Question24: You have finalized optimizing your portfolio and want to avoid any delay by directly recommending the initiation of multiple portfolio components. What do you need for starting this?
Question25: You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a tight schedule, a large number of stakeholders including the public, in addition to a strict budgeting framework, you know that you will be managing the performance closely and that the governance board and the stakeholders would want to check on the progress and performance frequently. For this you have developed a robust performance management plan. What is the expected result from developing this plan?
Question26: When managed correctly, the balanced scorecards can change the way an organization does business.Balanced scorecards keep focus on results. Which of the following are factors that can be targeted by the Balanced Scorecards method?
Question27: Risks perspectives differ within the organization between executive management, operations management, portfolio management and project/program management. When it comes to Operations management, which of the following is a risk concern?
Question28: One of the major resources on your portfolio is needed by two of the components at the same time. This resource has high technical knowledge and is aware of all the business needs. Which of the following tools and techniques can you use in order to solve this issue?
Question29: Managing risk is key to the success of any initiative. Risk is considered to be inherent in any activity we do in project management and at any level. Risk is part of project, program and portfolio management and has a different exposure in each and every one. You are currently developing the guidelines and approaches for managing risks and are looking for methods to help you. What are you looking for?
Question30: The Portfolio Management Office (PMO) provides support to the portfolio manager throughout the portfolio life cycle. Which of the below is not something that the PMO supports the portfolio manager with?
Question31: Risks are very important to manage in portfolio management and organizations can choose to embrace risks with the potential of high rewards. As a portfolio manager, planning and managing risks is important. Risks are categorized in order to ease the process. Which of the following are considered as risk categories that a portfolio manager can use?
Question32: As you work to determine which stakeholders had the highest degree of influence over the portfolio, you wanted to especially know about the members of the Portfolio Governance Board because:
Question33: While performing the manage supply and demand process, one of your sub-portfolio managers came to you asking advice on how to analyze intangible assets such as resources knowledge or skills based on the metrics defined. What should be your advice to him?
Question34: Portfolio Governance Model is developed as part of the Portfolio management plan and defines the way the organizational assets and resources are planned to be managed within the portfolio according to the specific environment of the organization. Which of the following is correct regarding the Governance Model purpose and content?
Question35: You are the portfolio management for a big corporate with existence in 3 continents. While planning the performance management and in particular the dashboards and reporting tools, which of the following options is the most important to account for the different geographical locations?
Question36: Assume your food additive company performed a capacity analysis and found some resources had not maintained their skill sets and basically were not as productive as others in the company. Rather than have a massive reorganization, instead the executives decided to eliminate the jobs of these staff members, many of whom had been in the company for more than 20 years. Morale among the existing staff is low as people fear there will be more layoffs. Plus the government issued a new regulation that requires an additional Food and Drug Administration quality check before a new additive can be submitted for regulatory approval. One member of the executive team wants to acquire another company to enhance market share, and the existing plants in the Asia Pacific region require infrastructure upgrades. Given resource shortages, only one component can be selected to be added to the portfolio. The Board should select:
Question37: Due to market technological changes, your company got impacted and was urged to revise its portfolios. You are currently revising your portfolio to determine the required changes in the component mix. Which of the following options shows a clear path from the "as-is" to the "to-be" vision?
Question38: As you work to determine which of four possible components to optimize the portfolio, assume you are using the internal rate of return as the key crite rion to make your recommendation. Only one new component can be added based on financial constraints. Each of the four potential components has benefits that support the strategic plan. Based on the following data, you recommend:
Question39: Managing risk is key to the success of any initiative. Risk is considered to be inherent in any activity we do in project management and at any level. As part of managing risks, the portfolio manager applies multiple analyzes and uses tools to help dealing with risks. What does the portfolio manager use to visualize risks impact on portfolio strategic objectives such as profitability?
Question40: You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. You started with developing the plan that will be used as guideline for the component plans to manage risks at their level. What are the outputs of this plan?
Question41: The existing portfolio manager was replaced by a new portfolio manager and the analysis has shown that the distance between the pessimistic and best case scenario of the new portfolio manager is larger than the old one, which kind of manager is the new one?
Question42: Your sponsor is under a lot of pressure from the management because the portfolio has been hit by multiple risks already and the situation is going towards its termination. Your sponsor asked you to prepare him an analysis to show the probable ROI and the confidence level in it. Which approach is the best one in this case?
Question43: Moving from project management to program management and now being appointed as the first portfolio manager in your cyber warfare company, you know you always wondered what happened to the various reports you had to prepare, and the metrics you had to collect. You are working now to determine critical metrics for portfolio management and decided to involve as many people as possible through questionnaires and surveys. You also held some focus groups. The purpose is to:
Question44: In a portfolio, data is an abundant asset, and managing the information aiming for a a better decision making is critical. For this you use a variety of Quantitative and Qualitative analysis methods. These methods are performed in 4 of the portfolio management processes and serve a slightly different purpose in each and every one of them. When it comes to the optimizing portfolio, what is the purpose of using this analysis?
Question45: While managing portfolio communications, the portfolio manager needs to account for the communication needs of the component teams in order for them to stay in the loop of the big picture. Which of the following can be of interest to this group of stakeholders?
Question46: As part of developing the Communication Management Plan, a portfolio manager executes the Communication Requirements Analysis, in addition to Stakeholders Analysis. Which of the following options in your opinion is a result of the Communication Requirements Analysis?
Question47: When managed correctly, the balanced scorecards can change the way an organization does business.Balanced scorecards keep focus on results. As a portfolio manager, you know that the purpose of using the balanced scorecards is
Question48: As a portfolio manager you visit and re-do the Optimize Portfolio process continuously. Which of the following, in your opinion, is the objective/purpose of the Optimize Portfolio Process?
Question49: Assume you are the portfolio manager for a legacy software company. For many years, your company was one of the top five leaders in software development, but as newer and more efficient software was invented, it began to lose market share. Your company then found its services were needed as legacy systems were converted, especially since Cloud computing now is so popular. But it has lost revenues increasingly over the years. To gain market share and provide greater portfolio value, the executive team decided it should:
Question50: Due to market technological changes, your company got impacted and was urged to revise its portfolios. You are currently revising your portfolio to determine the required changes in the component mix. Which of the following options helps in assessing the capability of the organization to undertake the portfolio with its new strategic direction, and what is needed to be done?
Question51: Due to a strategic change, multiple components on your portfolio have been terminated, leaving you with limited remaining funds coming from the terminated components. What should be your best course of action?
Question52: In a portfolio, data is an abundant asset, and managing the information aiming for a better decision making is critical. For this you use a variety of Quantitative and Qualitative analysis methods. Considering that you are currently working to quantitatively measure component values, however a few components have intangible benefits and can not be measured using quantitative analysis. How do you plan to proceed?
Question53: You are currently in the process of allocating resources to develop component proposals, authorizing components to expend resources and to communicate portfolio decisions. What do you expect as outputs of this process?
Question54: You are managing a highly technical portfolio and are already mid-way through the implementation. You know that the communication is key to success as all the involved parties and stakeholders have a high technical exposure and you should maintain their buy-in along the lifecycle. Part of your activities is to collaborate with stakeholders to reach a common ground and to resolve conflicts. Which of the following is considered a collaboration technique?
Question55: Due to market technological changes, your company got impacted and was urged to revise its portfolios. You are currently revising your portfolio to determine the required changes in the component mix. Which of the following options is the means to the "to-be" vision?
Question56: Assume you are working in a division in your country's Department of Interior. The Department is set up in Bureaus, and your work falls within Natural Resources. Your division is the Water Resource Division. You are responsible as the portfolio manager for the work in this Division. As you work on the portfolio for the upcoming year, you point out to the members of the Portfolio Review Committee that:
Question57: You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a tight schedule, a large number of stakeholders including the public, in addition to a strict budgeting framework, you know that you will be managing the portfolio closely and that the governance board and the stakeholders would want to check on the progress and status frequently. For this you have developed a robust Portfolio management plan. What do you expect as output of this development?
Question58: Portfolio Prioritization Model is included in the Portfolio management plan and guides the ongoing decisions as to which portfolio components should be added, terminated, or changed; which of the following is correct regarding the Prioritization Model purpose and content?
Question59: The sponsor came to you asking for a high level timeline to depict the approach that you will take to execute this portfolio. What tools and techniques is useful in your case?
Question60: The company's management is not happy with the bared risk for the expected Portfolio value return and has reached a subject matter expert to try to re-align the risk level with the management expectations. The expert stated that it is preferable to diversify the portfolio components in order to get more results. In that case, you
Question61: You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a tight schedule, a large number of stakeholders including the public, in addition to a strict budgeting framework, you know that you will be managing the communication closely and that the governance board and the stakeholders would want to check on the progress and performance frequently. For this you have developed a robust Communication management plan. What is the result of developing this plan?
Question62: Managing value is key to success as portfolio are undertaken to ultimately deliver an outcome that is strategically aligned and which delivers value to the organization. While managing value, the portfolio manager invokes the Benefits Realization Analysis activity. Which of the following is part of this activity?
Question63: As part of the Portfolio Communication, the Portfolio Manager analyzes the raw data assimilated from the portfolio process assets and from the stakeholder analysis. This analysis aims to isolate the data that hold value to the receiving audience. Which tool can the portfolio manager use to help him in performing this analysis?
Question64: Assume you are the portfolio manager for your pork producing company, the market leader in your country.Over time, the industry has recovered from trichinosis as a risk. Your company has added new components to its portfolio, and many have been to demonstrate to the public that its products are safe. It implemented the Agriculture Department's and Food and Drug Administration's Hazard Analysis and Critical Control Point (HACCP) regulations and is enhancing its image as 'the other white meat'. However, now the entire industry is faced with a new epidemic known as porcine epidemic virus, which is affecting pigs in 22 different states, and profits have decreased significantly. New components now must be added to the portfolio. This situation shows:
Question65: While Optimizing your portfolio, you need to present to the governance board how your components will be ranked and balanced in a quantifiable way. How will you do this?
Question66: Efficiency is highly regarded when managing a portfolio and spans all activities i.e. risk management, communication management, etc. A portfolio is considered efficient if it
Question67: In a portfolio, data is an abundant asset, and managing the information aiming for a better decision making is critical. Information is considered to be the link between the portfolio activities and entities. You are currently collecting, analyzing, storing, and delivering portfolio information to stakeholders in accordance with their requirements. What can help you in doing this?
Question68: You have scored the portfolio components and are analyzing the data in order to prioritize the components.Using the following scoring table, which of the options represents the correct Components Priority?Larger image
Question69: Initiatives in the companies aim to deliver values. For a portfolio, the value is delivered through a mix of components with similar strategic goals and objectives. Multiple components can contribute in the realization of the same organizational value. While managing the portfolio value, how do you depict the relationships between components in achieving value?
Question70: Assume you are the portfolio manager for your training company. It decided to implement portfolio management in a major way to ensure it remained competitive in the changing market and could offer a variety of methods to deliver courses rather than only in a face-to-face setting. The company set up a Portfolio Management Group, and you are responsible for providing information on portfolio status and then providing information to those interested stakeholders about the Board's decisions. You want to make sure the reports meet stakeholder requirements. After performing a detailed communications requirements analysis, you found it interesting that stakeholders wanted information about:
Question71: Throughout the course of the portfolio lifecycle, components are initiated, terminated and updated. In order to be initiated, portfolio components receive go/no-go decisions during governance meetings. During which process the go/no-go decisions are taken?
Question72: You are currently in the process of defining a portfolio by forming the qualified list of components that will be later evaluated, selected and prioritized. What do you expect as outputs from this process?
Question73: When we talk about portfolios, programs and projects, it is inevitable to mention the business value which is the sum of tangible and intangible assets of an organization, also known as the net quantifiable benefit. When it comes to business value, at which level of the organization is the Business Value achieved?
Question74: Due to a strategic change, multiple components on your portfolio have been terminated, leaving you with limited remaining funds coming from the terminated components. What should be your best course of action?
Question75: While planning for risk management, multiple investment choice tools are used as part of the quantitative and qualitative analyzes; which of the following tools determines the effect of changing one or more factors?
Question76: Your executive management has been recently undergoing a change from a functional organization to a projectized one and is currently assessing the volume of work that the organization can execute. Which of the following tools and techniques will decide the volume of work and components that the organization can execute?
Question77: As a portfolio manager you will use a variety of artifacts and documents that will help you better manage the portfolio and better communicate progress and status with stakeholders. The roadmap is considered the most used document in the portfolio and eases your work being able to present the status on a single graphical representation. Early on during the portfolio lifecycle, you prepare the roadmap. An output of this process is
Question78: Managing risk is key to the success of any initiative. Risk is considered to be inherent in any activity we do in project management and at any level. When it comes to risk tolerance definition, which of the following is the correct one?
Question79: While defining the portfolio, the portfolio manager uses a set of evaluation criteria in order to generate a list of portfolio components for optimization and balancing. Which of the following is not an evaluation criteria?
Question80: Information and direction about the organization's vision, mission, prioritization, and resources should be obtained before the portfolio's strategic plan is developed by reviewing:
Question81: It is rare for organizational leaders to have an in-depth knowledge of all the work under way in the portfolio, but it is needed for portfolio decision making. If you were asked to prepare such an inventory, it would:
Question82: When we talk about portfolios, programs and projects, it is inevitable to mention the business value which is the sum of tangible and intangible assets of an organization, also known as the net quantifiable benefit.When it comes to business value, at which level of the organization is the pursuit of Business Value optimized?
Question83: Resources allocation and optimization for use is key to a successful portfolio. You have assigned human resources, funds and other required assets to a component that you have initiated recently. What should have been done prior to being able to to that?
Question84: As a portfolio manager you try to use all the information available to you in order to get the best out of the existing information and to better plan and manage the portfolio. The Enterprise Environmental Factors are important and referenced throughout the portfolio life cycle. Which of the following is correct regarding their purpose and focus?
Question85: You have been assigned as a consultant to give your expertise on a failing portfolio which is critical to the success of your client's organization. You are now in the process of reviewing the portfolio management plan.What do you expect to see as part of this plan?
Question86: While managing portfolio value, you met with stakeholders and discussed how to address the strengths and weaknesses in order to ensure benefits are comprehensively and holistically taken into consideration. Which of the following tools and techniques are you performing?
Question87: Enterprise environmental factors (EEFs) may constrain portfolio management options and may have a positive or negative influence on the outcome. Which of the following is not considered part of the EEFs?
Question88: Your company changed its executives due to the lack of benefits realization and previous corruption issues.The new management has informed you that as of now, this will not change any process in the portfolio and everything will remain the same. However, only the risk tolerance for the organization will be impacted, what will you do as a portfolio manager?
Question89: Your CEO is keen to know the likelihood of the portfolio to realize the expected ROI. You are currently looking for a tool to calculate the probability to achieve portfolio objectives. Which of the following will help you in doing that?
Question90: You have been recently assigned to a critical portfolio in your company and wanted to start right away and decided to begin with aligning the strategic management of the portfolio to the organizational strategy and objectives. For this you will use
Question91: You are currently creating portfolio scenarios (what-if analysis) by reviewing components against prioritization criteria and using analysis techniques (e.g., options analysis, risk analysis, SWOT analysis, financial analysis). You are doing this in order to
Question92: A portfolio manager needs to continuously balance the need and requirements with the available resources and needs to maintain a balanced portfolio and portfolio resources in order to optimize delivery. For this, you are always on the lookout to optimize your portfolio. What can you use to start this process?
Question93: Assume you are the portfolio manager for a company that specializes in software, including portfolio management software. It has many components under way to enhance the existing product line but also to move the company into Cloud computing. You regularly prepare reports on the portfolio status but lately have had a large number of stakeholders request ad hoc reports. You decided to survey your stakeholders to learn about their information needs. You next decided to hold some one-on-one interviews with several interested and influential stakeholders in terms of communications requirements. From these interviews you are concerned that some stakeholder groups may be missing so you decided to:
Question94: While your organization maintains a decision register after each meeting of the Portfolio Review Board, this register only notes decisions that are made when a component is added to the portfolio or if the Board terminates a component. If the component is terminated, the reason for the termination is not listed. Also if a proposed component is not approved, the reason is not listed. It is evident this register is lacking in its usefulness, which means it requires updating as it is:
Question95: A number of components proposals are on the table as a result of the strategic planning cycle. While defining the portfolio, you wanted to make a preliminary screening of the proposed components in order to filter them based on the acceptance criteria. Which of the following techniques you use?
Question96: Assume you are the portfolio manager for a telecommunications company. Your company was about to launch a new and easy to use smart phone with more features than any existing phones on the market at a lower price.However, although the phone was due to market in five days, the Federal Communications Commission issued today a regulation that would make your new phone not available for use in airplanes. Thus additional work must be done, and your executives are wondering whether a new phone should be developed for this new feature. You are ensuring that if a new phone is developed, or if the almost completed product is not to be marketed, there is still alignment to the organization's strategy. As you complete an analysis of alternatives, you also should ensure results of the analysis are reflected in the:
Question97: A portfolio manager needs to continuously balance the need and requirements with the available resources and needs to maintain a balanced portfolio and portfolio resources in order to optimize delivery. Capability and Capacity analysis is performed in 4 of the portfolio management processes and it serves a slightly different purpose in each and every one of them. When it relates to developing the performance management plan, what is the purpose of using this analysis?
Question98: In preparing your communications matrix, you identified five communication areas. One is portfolio governance decisions. A communication vehicle for these decisions is:
Question99: The portfolio management information system is often a collection of spreadsheets rather than automated tools. An effective PMIS enables the portfolio manager to define, analyze, design, produce, and manage information systems to support a successful portfolio, and includes tools and processes such as:
Question100: Due to market technological changes, your company got impacted and was urged to revise its portfolios. You are currently revising your portfolio to determine the required changes in the component mix. Which of the following options shows a clear path from the "as-is" to the "to-be" vision?
Question101: You have been assigned as the manager for a major transformation portfolio in your company. You have a new direction in sight and you need to work with the team to attain the end goal and achieve the expected strategy. You have just finalized managing the strategic change and you are expected to present the following documents:
Question102: Your company changed its executives due to the lack of benefits realization and previous corruption issues.The new management has informed you that as of now, this will not change any process in the portfolio and everything will remain the same. However, only the risk tolerance for the organization will be impacted, what will you do as a portfolio manager?
Question103: Performance reporting is important in a program and usually, the portfolio manager aggregates performance information from the portfolio components in order to present the related reports. Which of the following measures can be used in performance reporting?
Question104: When it comes to managing the portfolio value, one of the junior portfolio managers came to you asking about the relation between cost-benefit analysis and the efficient frontier analysis. What should your answer to her be?
Question105: You have been newly appointed as a portfolio manager and found out that your predecessor did not develop a Portfolio Risk Management plan as he thought that it is not necessary in the case where he has a risk register.One of your first activities was to develop the missing plan. To do this, you needed to consult with stakeholders in order to fetch risk information in order to identify risks and plan risk management. Which of the following inputs to this process will help you in identifying which stakeholders to analyze?
Question106: While there are a number of recommended contents of the portfolio strategic plan, a guiding principle is to:
Question107: Following a major organizational restructuring, new portfolios are currently being initiated. You have been assigned the position of portfolio manager on one of the major portfolios and are currently in strategic management. You are currently meeting with stakeholders to document the internal and external financial dependencies and shared resources between different portfolio components. Which of the following techniques are you performing
Question108: A big strategic change occurred at the organization level and has impacted multiple portfolios in the organization including yours. The CEO has asked you to prepare a presentation to depict the impact of this change on portfolio resources. Which of the following should you present in this case?
Question109: A portfolio manager on one of the major sub-portfolios in your portfolio has tendered his resignation and gave you a 2 months notice. This unexpected change will require you to take immediate action with the governance board. Which of the following processes will be handling this situation?
Question110: The portfolio undergoes a lot of changes through the portfolio life cycle, and the state of the portfolio changes on the go. Some components are terminated, other are added and initiated. When it comes to the authorize portfolio process, which of the following represents the state of the portfolio
Question111: You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a tight schedule, a large number of stakeholders including the public, in addition to a strict budgeting framework, you know that you will be managing the performance closely and that the governance board and the stakeholders would want to check on the progress and performance frequently. For this you have developed a robust performance management plan. What is expected to be found in this plan?
Question112: A number of components proposals are on the table as a result of the strategic planning cycle. While defining the portfolio, you wanted to use a method to help you compare portfolio components that address similar needs. Which of the following techniques you use?
Question113: Portfolio Governance is important in a portfolio to maintain correct alignment, monitor and control performance and status, reshuffle the mix of components as found necessary, etc. Governance management includes which of the following processes?
Question114: An urgent review meeting was set due to the discovery of multiple risks which can have drastic effects on the portfolio. As a result of the meeting, it was agreed to increase the portfolio budget and add more resources in order to manage the new risks. Which of the following documents needs to be updated as a result of this decision?
Question115: Your team members were having a discussion about the purpose behind the development of the Portfolio Charter and they came to you for advice because they could not agree on a common answer. What would be your advice to them?
Question116: As part of the portfolio communication management, multiple documents are prepared in order to effectively manage communications. The Stakeholder matrix is one of the prepared documents, what does it include?
Question117: When managed correctly, the balanced scorecards can change the way an organization does business.Balanced scorecards keep focus on results. As a portfolio manager, you know that the purpose of using the balanced scorecards is
Question118: You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you are coaching your team on the same. You are currently developing the Risk Management Plan. What can you use as inputs to this process?
Question119: The company's management is not happy with the bared risk for the expected Portfolio value return and has reached a subject matter expert to try to re-align the risk level with the management expectations. The expert stated that it is preferable to diversify the portfolio components in order to get more results. In that case, you
Question120: Assume you recently were hired to be the first portfolio manager at the leading producer of soft drink beverages. While the company is well known for one product, it wants to be the leader in other products and services as well. When you were hired, you told the CEO it would take time to fully implement portfolio management, and you first would prepare a number of artifacts. He set up a Portfolio Review Board, and its members are reviewing your work. As they reviewed the portfolio management plan, one of the members suggested you prepare an in-depth portfolio performance plan. Your first step is to:
Question121: A major strategic change has occurred and you are managing the change at portfolio level. You are currently performing gap analysis and you receive information on a stakeholder that is extremely unhappy with how the change will be handled in your portfolio. What should be your best course of action?
Question122: One of the major steps for a portfolio manager is to know which components qualify to be included in the mix of components that will achieve the strategic objectives sought by the portfolio. As a program manager, you will use a variety of methods to help you achieve this purpose. Which of the following are valid tools and techniques?
Question123: You have been assigned as the manager for a major transformation portfolio in your company. You are acquiring the position due to the failure of the previous manager and the strategic importance of the portfolio.You start by consulting the portfolio strategic plan. What do you expect finding in that plan?
Question124: You are currently in the process of allocating resources to develop component proposals, authorizing components to expend resources and to communicate portfolio decisions. What do you expect as outputs of this process?
Question125: Risks perspectives differ within the organization between executive management, operations management, portfolio management and project/program management. Which of the following are common risk concerns across the organization?
Question126: Your executive management has been recently undergoing a change from a functional organization to a projectized one and is currently assessing the volume of work that the organization can execute. Which of the following tools and techniques will decide the volume of work and components that the organization can execute?
Question127: You are managing a complex portfolio with high risk levels due to emerging technological breakthroughs and a short benefit window to market your product. You know that managing risk is key to success and you continuously report risks and issues to stakeholders. One of the key stakeholders is furious as he cannot find an issue that has occurred a week ago in the risk register. What should you do in this case?
Question128: The Scenario Analysis is used twice as a tool and technique, once while developing the charter and another time while managing Supply and Demand (It also exists as part of the quantitative and qualitative analysis as part of the optimize Portfolio process). When it comes to Manage Supply and Demand, which of the following represents a correct description of the Scenario Analysis?
Question129: Assume your company is a leading producer of AA and AAA batteries. However, it is a competitive market, and customers desire batteries with a longer life and a smaller size so they will not require replacement. As you set up categories for portfolio components, you will continue to produce your current product line as well as pursue advanced products to meet customer needs. A useful component category, therefore, is:
Question130: A major strategic change has occurred and you are managing the change at portfolio level. You are currently performing gap analysis and you receive information on a stakeholder that is extremely unhappy with how the change will be handled in your portfolio. What should be your best course of action?
Question131: Embracing a management-by-projects culture means there tends to be far more projects to pursue than available resources. An approach then is required to guide decisions as to components in the portfolio. A best practice to follow is to:
Question132: While managing a program for the banking sector spanning multiple transformational areas. A new portfolio manager comes to you seeking advice on the usefulness of ROI. You tell her that ROI is the best method to measure returns of
Question133: Which of the options is considered part of Enterprise Environmental Factors (EEFs)
Question134: Your Portfolio Review Board is scheduled to meet in a week. Resources only are available to support one project, and detailed business cases have been prepared for two of them. Your company has a policy of being risk adverse. Based on the following table, which project would you recommend to the Board, and what else would you mention to them?
Question135: Portfolio Prioritization Model is included in the Portfolio management plan and guides the ongoing decisions as to which portfolio components should be added, terminated, or changed; which of the following is correct regarding the Prioritization Model purpose and content?
Question136: One of your team members came to you asking about the risk "Watch List"; he heard this term in a meeting on risk analysis and did not know what it meant. What will your advice to your team member be?
Question137: Assume you are responsible for portfolio management in your organization. You are responsible for managing the value of the portfolio and for recommending changes to your Portfolio Review Board to enhance its value.To do so, you monitor benefits, interdependencies between components, changes, and responsibilities and accountabilities as stated in the:
Question138: After a strategic change is managed and finalized, you as a portfolio manager, are expected to document changes to the portfolio components attributes. Which of the following is the document in which you document these changes?
Question139: While planning for risk management, multiple investment choice tools are used as part of the quantitative and qualitative analyzes; which of the following tools determines the effect of changing one or more factors?
Question140: Assume at this point as the portfolio manager in your mattress company, you are activating portfolio components, updating portfolio reports, and documenting the decisions made at the recent Portfolio Governance Committee meeting as the company moves into new markets. You are therefore:
Question141: You are managing a portfolio for your company and are trying to balance the tasks that will be done internally based on the availability and the ones that will be outsourced. Managing supply and demand is a recurring activity in the portfolio life cycle and results in changes in resource utilization and resource efficiency. Which of the below helps in optimizing the supply and demand?
Question142: As a result of optimization, one of the components was deemed necessary to be terminated. One of the executive managers found about this and called you telling you that you should leave this component as it is of interest to her and she wants to see it finalized and that she will make resources available to it if needed. What should be your best course of action?
Question143: A junior Portfolio manager has come to you for advice. He is hearing a lot about the focus of portfolio management practices, however, he is not sure anymore of the exact answer. What do you, as an experienced portfolio manager tell him?
Question144: Manage supply and demand comes down to balancing the requirements with what is available. Resource requirements are a major input to the manage supply and demand process. Which of the following inputs to this process contains resource requirements?
Question145: A portfolio manager needs to continuously balance the need and requirements with the available resources to maintain a balanced portfolio and portfolio resources in order to optimize delivery, in addition to managing communication, risk, etc. For this you develop a robust Portfolio Management Plan. Which of the below is not a part of this plan?
Question146: Your company got recently acquired by another company and the strategic directions which your portfolio is based on have been changed. Which document do you, as a portfolio manager, change to reflect the new stakeholders and their expectations?
Question147: The portfolio manager defines the portfolio based on a listing of already existing work in the organization and selects the right components in order to be able to prioritize them. What do you use for defining the portfolio based on the listing of work?
Question148: Stakeholders expectations and requirements change throughout the portfolio life cycle. New stakeholders can be added or removed and requirements need to be continuously solicited in order to keep the portfolio aligned with stakeholders expectations. What is the process for soliciting requirements called?
Question149: One of your components' managers came to you stating that she cannot find a key stakeholder by email and if she cannot find him, a major decision will be delayed, thus affecting the entire portfolio. What should you, as a portfolio manager do?
Question150: You are in the process of planning the portfolio for a major client and wanted to put an extra effort on planning for managing the performance as the portfolio has a lot of technical aspects and correct performance management is key to success. What tools and techniques can you use for this purpose?
Question151: As a portfolio manager you try to use all the information available to you in order to get the best out of the existing information and to better plan and manage the portfolio. The Enterprise Environmental Factors are important and referenced throughout the portfolio life cycle. Which of the following is correct regarding their purpose and focus?
Question152: You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a large number of stakeholders including the public, you know that you will be managing the communication closely and that the governance board and the stakeholders would want to check on the progress and performance frequently. For this you have developed a robust communication management plan. What is expected to be found in this plan?
Question153: You are managing a portfolio in a functional organization and resources are shared between operations and projects. You are continuously performing capability and capacity analysis in order to optimize the portfolio.Which of the following capability and capacity analysis is used to just limit the number of components the organization can execute?
Question154: Throughout the course of the portfolio lifecycle, components are initiated, terminated and updated. In order to be initiated, portfolio components receive go/no-go decisions during governance meetings. During which process the go/no-go decisions are taken?
Question155: The members of your Portfolio Review Board and other key stakeholders tend to be risk adverse as the company has survived recent recessions and is profitable. However, in an upcoming meeting with the corporate Board of Directors, they have asked you to show the frequency of meeting certain cost objectives at various percent points. For example assume the portfolio is to meet a $41,000 target in the next month, to be75% confident this will occur, a forecast of $50,000 is needed. This means you need to show:
Question156: Working to manage portfolio value is a continuous task. In doing so, as the portfolio manager, you review the monthly and any ad hoc reports submitted by component managers. This month you saw there was an excellent opportunity for major cost savings in two components in the top five on the portfolio list; however, to realize this cost reduction, these components require resources to be reallocated from other components in progress for six months. These forecasts then:
Question157: Following a major organizational restructuring, new portfolios are currently being initiated. You have been assigned the position of portfolio manager on one of the major portfolios and are currently in strategic management. You are currently performing cost-benefit analysis. What is part of this analysis?
Question158: A new project manager was given an assignment on one of the components in your portfolio. What will you do as a portfolio manager in order to align the project manager with the strategic direction and integrate him/her with the work in progress?
Question159: One of your team members who is particularly interested in becoming a portfolio manager has asked you what is the relation between the Portfolio roadmap and the Programs/Projects roadmaps? What should be your answer to him?
Question160: You are the manager for a governmental portfolio aiming to restructure the roads in your country. Having a tight schedule, a large number of stakeholders including the public, in addition to a strict budgeting framework, you know that you will be managing the portfolio closely and that the governance board and the stakeholders would want to check on the progress and status frequently. For this you have developed a robust Portfolio management plan. What do you expect as output of this development?
Question161: Multiple changes have been recommended and approved in your portfolio and the need for continuous optimization seems to never end. This is normal in a portfolio and optimizing the components mix and the use of resources is key to success. As a portfolio manager you will be re-visiting the Optimize Portfolio process countless times. Which of the following are considered outputs to this process?
Question162: As part of the periodical strategic management cycle, the portfolio management team is revising the portfolio and re-doing the strategic management part. Currently, they are assuming and evaluating different combinations of components in order to come up with multiple approaches and take a decision on the portfolio structure. What is currently being performed?
Question163: As part of developing the Communication Management Plan, a portfolio manager executes the Communication Requirements Analysis, in addition to Stakeholders Analysis. Which of the following options in your opinion is a result of the Stakeholders Analysis?
Question164: As you prepare your communications management plan you realize that stakeholder requirements may change over time, and these changes then will need to be reflected in updates to the plan. As the plan defines the overall communication process not only for gathering information but also in determining recipients of it, it also:
Question165: Aligning the portfolio with the strategic objectives starts by developing the Portfolio Strategic Plan. You are currently developing this plan and are looking for a document that provides you long-term direction. What are you looking for in this case?
Question166: Portfolio management processes are performed in an environment broader than a portfolio; therefore, an organization-level implementation team supported by executive management, a governing body, and portfolio managers join forces to implement organization-level portfolio management processes. After Defining roles and responsibilities for portfolio management process implementation, what should be the FIRST next step?
Question167: You are the manager of a major portfolio with a variety of stakeholders and stakeholder groups. you know that managing communication is key to success and you stress on maintaining a high communication level. As part of the portfolio communication management, multiple documents are prepared in order to effectively manage communications. The Communication matrix is one of the prepared documents, what does it include?
Question168: The governance role in oversight is abundant during planning in order to agree on multiple roles and responsibilities including those of a portfolio manager. The agreements are recorded in the meeting minutes and included as updates to
Question169: You have finalized optimizing your portfolio and want to avoid any delay by directly recommending the initiation of multiple portfolio components. What do you need for starting this?
Question170: Two functional managers within your portfolio are arguing about one scarce resource, and each one is claiming that the resource should be assigned to them. What should you do as a portfolio manager in order to solve this issue?
Question171: In a portfolio, data is an abundant asset, and managing the information aiming for a better decision making is critical. For this you use a variety of Quantitative and Qualitative analysis methods. Considering that you are currently working to quantitatively measure component values, however a few components have intangible benefits and can not be measured using quantitative analysis. How do you plan to proceed?
Question172: A portfolio manager on one of the major sub-portfolios in your portfolio has tendered his resignation and gave you a 2 months notice. This unexpected change will require you to take immediate action with the governance board. Which of the following processes will be handling this situation?
Question173: Assume you are helping the Portfolio Review Board select and implement the portfolio with the best alignment to strategy as you work to create a list for to be considered for prioritization. One possible component on the surface does not seem to be one that is profitable, but you believe that over time changes will occur that will make it cost/beneficial to pursue. This means you are using:
Question174: The Portfolio Management Office plays an integral role in Portfolio Management and offers support to the portfolio manager throughout the portfolio life cycle. What is the role of the PMO with respect to the portfolio performance metrics?
Question175: Assume after the acquisition of the natural gas transmission company by your company, a natural gas distribution company, was approved by the various regulatory agencies. You now are overseeing more components with this acquisition as the portfolio manager. While you had each of the components in your company set up in various categories, this approach had not been followed by the transmission company. You explained to its portfolio manager and staff such an approach enables:
Question176: While managing the portfolio value, it is important to know the different roles of responsibilities and accountabilities for the actual benefits realization in order to be able to aggregate the correct value from different components; in which document are these roles and responsibilities mentioned?
Question177: You are the manager of a major portfolio with a variety of stakeholders and stakeholder groups. you know that managing communication is key to success and you stress on maintaining a high communication level. You have just finalized the development of the Portfolio Communication Management Plan. Which of the following is correct regarding its purpose and focus?
Question178: Assume you are working to ensure your organization has a balanced portfolio. You have decided to use a bubble diagram and have set it up to show the components in terms of: ease of execution [difficult or easy] and component importance [high or low]. In such an approach, bubbles are used to:
Question179: Your sponsor has urged you to analyze Portfolio Risk before the end-of-week governance board meeting as the CEO will be present and is interested in Portfolio risk data in particular. Currently, you do not have adequate risk information in order to analyze data and give recommendations. Which tool is the most suitable for you to use in this case?
Question180: There was a change in your portfolio to speed up things resulting in the addition of new components. In order to update the new vision, dependencies and timeline for the components, you should update which of the following?
Question181: A number of components proposals are on the table as a result of the strategic planning cycle. While defining the portfolio, you wanted to use a method to help you compare portfolio components that address similar needs. Which of the following techniques you use?
Question182: Multiple communication methods are used by the portfolio manager in order to proactively convey messages and engage the stakeholders at the right time and in the right manner. Which tool is used to visually convey multiple messages at the same time?
Question183: You are managing a large portfolio and are approaching to a major checkpoint. As a portfolio manager, you are now collecting information and reports from various components for aggregation and presentation. What method/tool can you use to support you in this process?
Question184: The portfolio management information system (PMIS) is often a collection of spreadsheets rather than automated tools. An effective PMIS enables the portfolio manager to define, analyze, design, produce, and manage systems to support a successful portfolio. Which of the following is a trait of a PMIS?
Question185: Assume you are the portfolio manager for the Federal Railroad Administration. Funding is provided annually according to the Government's budget process. Any monies that are not spent at the end of a fiscal year are lost, and there are some restrictions in place concerning whether funds can be transferred to different programs, projects, or operations work in the agency. Therefore, to maximize the use of funding you require:
Question186: Efficiency is highly regarded when managing a portfolio and spans all activities i.e. risk management, communication management, etc. A portfolio is considered efficient if it
Question187: Portfolio balancing can be done in several different dimensions based on organizational preferences. When your software development company, which is CMMI Level 5 certified, began to focus on portfolio management four years ago, you started with a simplified ranking approach and now moved into using an automated, sophisticated weighted scoring software tool throughout the organization. In terms of portfolio balancing, it is appropriate to:
Question188: Your company got recently acquired by another company and the strategic directions which your portfolio is based on have been changed. Which document do you, as a portfolio manager, update to reflect the change to the timeline?
Question189: You are managing a portfolio in a functional organization and resources are shared between operations and projects. You are continuously performing capability and capacity analysis in order to optimize the portfolio.Which of the following capability and capacity analysis is used to limit the number OR size of components the organization can execute?
Question190: You are managing a portfolio for your company and are trying to balance the tasks that will be done internally based on the availability and the ones that will be outsourced. Managing supply and demand is a recurring activity in the portfolio life cycle and results in changes in resource utilization and resource efficiency. What you use to perform this?
Question191: Working to ensure the portfolio management process is one that is followed and is embraced has been a major challenge. As the portfolio manager, assume you set up meetings with the Portfolio Governance Group bi-weekly since there is constant change in your telecom company. You also want the portfolio process to be transparent. To do so, a useful tool to communicate status is:
Question192: You are the manager of a major portfolio with a critical strategic objective. You have just finalized the roadmap development and wanted to have a quick discussion on it with the team. One of your team members asks you your opinion on the relation between Portfolio roadmap and Strategic Objectives. What would your answer be?
Question193: Assume you are co-owner of a small consulting firm. Previously, you worked as a managing partner in one of the larger consulting firms in your country that had a defined portfolio management process to determine key opportunities to pursue to focus not solely on proposal win ratio but to aggressively emphasize capture ratio.Now in your new company in terms of portfolio management, the best practice to follow is to:
Question194: Portfolios include a lot of work and as a portfolio manager you need to keep an eye on the value realization while maintaining the strategic alignment. You are currently aggregating value delivered by the portfolio components. What can you use to help you in this context?
Question195: As part of the portfolio management plan, you have the "Manage Strategic Change" and the "Change Control and Management". This is causing issues to one of your team's junior portfolio managers as she cannot understand the difference. In your opinion, what is the difference between both?
Question196: You have been assigned as a consultant to give your expertise on a failing portfolio which is critical to the success of your client's organization. You are now in the process of reviewing the portfolio management plan.What do you expect to see as part of this plan?
Question197: After a recent Portfolio Review Board, the portfolio was optimized, and some components were added, while others were removed. Various portfolio reports also require updates such as:
Question198: You are managing a large portfolio and know that you will need to constantly show the progress and status of the portfolio in meeting. For this you have developed a robust roadmap using BI tools. The Portfolio Roadmap is an important document that is referenced throughout the portfolio life cycle. Which of the following is correct regarding the Portfolio Roadmap purpose and focus?
Question199: Your company got recently acquired by another company and the strategic directions which your portfolio is based on have been changed. Which document do you, as a portfolio manager, change to reflect the portfolio new vision?
Question200: When we talk about portfolios, programs and projects, it is inevitable to mention the business value which is the sum of tangible and intangible assets of an organization, also known as the net quantifiable benefit. When it comes to business value, at which level of the organization is the delivery of Business Value optimized?
Question201: The Portfolio Performance Management Plan is an important document that is referenced throughout the portfolio life cycle. Which of the following is correct regarding the Portfolio Performance Management Plan purpose and focus?
Question202: Due to multiple occurrences of risk realization, the CEO has asked you to re-assess the portfolio risks once again. Up to what level in the organization do you go when you need to assess risks?
Question203: As a portfolio manager you need to continuously balance the need and requirements with the available resources to maintain a balanced portfolio and portfolio resources in order to optimize delivery. One of your key stakeholders came to you asking to skip the manage supply and demand process as you have already prioritized and allocated resources through the strategic management and the governance processes. As a portfolio manager you should
Question204: When it comes to managing a portfolio, you have a variety of assets, plans and tools and techniques used. It requires a good experience to handle all of these artifacts. One of your portfolio team members came to you asking about the relation between the portfolio performance management plan, the portfolio management plan and portfolio strategic plan. What should your answer be?
Question205: As vision is the desired end state, it requires specific strategies to attain it. These strategies are best achieved by establishing:
Question206: You are the portfolio manager for a large and complex portfolio with a low risk appetite. You are currently planning for risk management, multiple investment choice tools are used as part of the quantitative and qualitative analyzes. Which of the following tools focuses on pricing and sales forecast?
Question207: Risk Management is integrated in all the other processes and process groups and is an integral recurrent activity throughout the portfolio life cycle. Which of the following is considered an external risk that can affect the portfolio?
Question208: You have been asked to be the manager for a governmental portfolio, and your starting point should be tendering a strategic plan to the board for validation and approval for continuation. Which documents/artifacts do you have debuting the portfolio that you can use to develop the strategic plan?
Question209: Portfolios include a lot of work and as a portfolio manager you need to keep an eye on the value realization while maintaining the strategic alignment. You are currently aggregating value delivered by the portfolio components. What can you use to help you in this context?
Question210: Assume the organization's strategy has undergone a significant change, and as a result the mix of components in the portfolio also will change. As the portfolio manager, you need to update your charter in order to reflect:
Question211: When managed correctly, the balanced scorecards can change the way an organization does business.Balanced scorecards keep focus on results. As a portfolio manager, you use the balanced scorecards while developing the Portfolio Management Plan in order to
Question212: You are the manager of a major portfolio with a critical strategic objective. You have just finalized the roadmap development and wanted to have a quick discussion on it with the team. One of your team members asks you your opinion on the relation between Portfolio roadmap and Strategic Objectives. What would your answer be?