Question1: A project team performed quarterly water testing and determined that the total dissolved solids (TDS) is above the 500 mg/L threshold. Which of the following steps should the project team take to address this issue?

Question2: A residential building has a small atrium. Which of the following should the WELL AP recommend to contribute toward Feature M07: Restorative Spaces?

Question3: Which strategy promotes proper hydration and access to drinking water and can contribute to points in the Water concept?

Question4: A design for a WELL building has HVAC zones of 650 ft2 (60 m2) and less than 10 occupants for more than
90% of regularly occupied spaces. This design

Question5: What is the intent of the Feature N02: Nutritional Transparency?

Question6: Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx.
328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its employee benefits and organizational policies. As an example, they offer a 50% discount on several mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
Which additional Nourishment feature could the protect achieve?

Question7: Which of the following ingredients is restricted in building products such as ceilings, wall panels, insulation products, furniture and millwork in Feature: X05 Enhanced Material Restrictions?

Question8: For all spaces except dwelling units which of the following requirements must a dedicated eating space meet to the support mindful eating habits?

Question9: The annual average particulate matter (PM2.5) outside of an office is 30 ug/m*. Which of the following indoor test results meets the requirements of Feature A01: Air Quality?

Question10: A primary school principal would like to Improve the fitness of primary school students. Which of the following suggestions should the WELL AP recommend to also most a WELL feature?

Question11: The guiding principle for promoting optimal circadian entrainment and sleep is

Question12: What is the value of performance verification in the certification process?

Question13: Which of the following filters can assist with the removal of organic chemicals from water intended for human consumption?

Question14: Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
Although the current MERV 11 filters in the return air ducts contribute toward compliance with Feature A04:
Construction Pollution Management, the installation of MERV 14 filters could help to achieve which additional feature?

Question15: The space layout plan of a Commercial project has been provided to the design team for comment. The plan shows a combination of open plan offices, breakrooms, circulation, a kitchen and a nap room. Which of the following aspects of the layout should the WELL AP highlight to the architect as presenting a potential acoustic issue?

Question16: Which of the following steps can be most effective in reducing antibiotics and pesticides in food?

Question17: A project failed performance verification of the PM 2.5 threshold for Feature A01: Air Quality, Part 1: Meet Thresholds for Particulate Matter. What should the WELL project administrator recommend for the curative action plan?

Question18: A design team is considering the WELL Building Standard to increase access to fresh, local and seasonal fruits and vegetables by reducing environmental barriers. Which of the following can also fulfill a WELL feature?

Question19: A project has just undergone performance testing Which of the following results meets the air quality threshold requirement in WELL Certification?

Question20: Studies indicate that the use of antibiotics in livestock and pesticides in agricultural crops contributes to which of the following conditions in people who consume associated food products?

Question21: Which of the following circumstances would best justify a project team's effort to pursue a greater investment in air purification strategies?

Question22: Which of the following room adjacencies is most likely to require additional sound mitigating transmission measures if reprogramming is not possible?

Question23: An operations manager intends to support employees' well-being by providing opportunities for recovery and restoration.
Which of the following options must be offered to support healthy working hours for all employees?

Question24: To reduce sound transmission between adjacent spaces, construction plans should specify

Question25: The facilities management team of a project has ordered a cleaning product that can harm occupants' health. A review of the documentation shows that the team members were unaware of the cleaning plan at the time of the purchase. What is the most likely cause of the misunderstanding?

Question26: Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx.
328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its employee benefits and organizational policies. As an example, they offer a 50% discount on several mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
Given the facade design, referenced in the protect scenario A, which feature is most appropriate for this project?

Question27: Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
How can this project earn points from a feature in the Nourishment concept?

Question28: A well-being team in a commercial office building is interested in starting a garden. Twenty of the 400 employees are interested in starting an herb and vegetable garden. A minimum of how much space is required for the garden to earn an Optimization in the WELL Building Standard™ (WELL™)?

Question29: For an office building with 1,500 regular occupants and 500 occasional visitors per day, which of the following facilities meets the requirements established in Feature V04: Facilities for Active Occupants?

Question30: A team is seeking to satisfy Feature A01: Air Quality, Part 2: Meet Thresholds for Organic Gases through VOC monitoring for a 87.50O ft2 (8 120 m2) project What is the minimum number of volatile organic compound (VOC) sensors that the project owner must install?

Question31: A project team plans to seal the HVAC ducts in order to protect them from possible air contamination. In which of the following building phases is this measure most likely to be adopted?

Question32: The office manager has received several complaints that staff who use the boardroom can clearly hear and understand conversations that take place in the adjacent corridor. What is the likely cause of this acoustic issue?

Question33: Which of the following is an accurate list of the core parameters that impact thermal comfort in a mechanically conditioned space?

Question34: A financial service office is undergoing renovation and would like to provide nature access to its employees.
Which of the following should the design loam include for regular occupants to access to moot Feature MOO Enhanced Access to Nature?

Question35: A developer wants to complete WELL Certification quickly for a WELL Core office building. The WELL documentation is approved for the project, the base building is complete, but the building is not yet occupied.
Which step should the project team take first to address the developer's goal?

Question36: A company is moving is 1, 500 employees into a new office building, which has lust passed documentation review. The building contractor has handed over the project. And the certificate of occupancy was granted two months ago Currently, 650 employees occupy the building. Which of the following steps should the WELL AP advise the project team to take next?

Question37: What requirement within C02: Integrative Design includes communication about how implemented building operations, maintenance, programs and policies support adherence to WELL?

Question38: An open office has an overhead T8 Fluorescent lighting system. To comply with Feature L04 Electric Lighting Glare Control, what is the maximum luminance for light omitted more than 45 degrees from nadir and below the horizontal plane?

Question39: An Environment. Health and Safety (EHS) manager finds that an quality at an indoor construction site is degrading because the contractors are demolishing wooden boards Which stop should the manager lake first to address this problem?

Question40: Exposure to which of the following contributes to Orcadian photoentrainment. resulting in a "phase advance'' shift of the circadian phase?

Question41: For projects to obtain WELL Certification at the Platinum level, what is the minimum number of points that must be achieved per concept?

Question42: Which of the following can help a real estate investor select a site with access to local mass transit to comply with the WELL Building Standard (WELL)?

Question43: Workplace family support includes parental leave policies that give paid paternity and maternity leave for the primary caregiver during any 12-month period for at least

Question44: Feature C07: Enhanced Health and Wellness Promotion requires projects to cultivate a culture of health through communication, health promotion programs and educational sessions. What is the minimum frequency required of these sessions?

Question45: For projects that include operable windows, which of the following outdoor air contaminants determine how window use should be managed?

Question46: In addition to addressing a variety of emergency situations, what else must a project address in Feature C03:
Emergency Preparedness?

Question47: A permanently installed an conditioner was used during construction What should be done to this equipment prior to occupancy?

Question48: A project team wants to provide compliant cycling infrastructure for its occupants to fulfill a WELL feature.
Which of the following should the team implement?

Question49: A small family-run business owned by an accredited nutritionist has noticed an increase in the number of processed foods brought in by employees for lunch. Which strategy could the WELL AP recommend at no additional cost to the client to meet the requirements of Feature N07 Nutrition Education?

Question50: Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B.
Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
This project is located within a walking distance of less than 656 ft. (200 m) from the riverfront park with a clear view of a river. Which feature does this location contribute towards?

Question51: A WELL AP is communicating the recertification requirements to the project owner. Which is the best strategy to simplify the process?

Question52: As a part of a new initiative of a hospital, the program leader is targeting Feature C11: Civic Engagement.
Which of the following policies should be implemented to support this endeavor?

Question53: Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx.
328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its employee benefits and organizational policies. As an example, they offer a 50% discount on several mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
How many showers with changing facilities are required for MILO to meet Feature V04: Facilities for Active Occupants?

Question54: Which of the following most affects respiratory health?

Question55: What is the maximum number of points that projects registered with WELL v2 may pursue under the Innovation Concept?

Question56: An office pursuing WELL Certification offers no-cost group fitness classes (30 minutes, twice per week) and is pursuing V06: Physical Activity Opportunities for one point. The company's benefits package also includes a subsidy for employees to set individual physical activity and exercise goals and prizes when employees accomplish their goals. The project is hoping to use this to meet another feature. What other feature can the WELL AP recommend to this project based on the offerings in the benefits package?

Question57: The Project must provide which of the following pieces of information at registration?

Question58: Please click on the Project Scenario A button to review the project scenario and answer the following question.
MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A
MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.
They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.
Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx.
328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.
MILO considers itself a human-centric design firm and leads with a people-first approach through its employee benefits and organizational policies. As an example, they offer a 50% discount on several mindfulness apps and make guided meditation courses available twice per year to all employees on-site.
PROJECT SCOPE & GOALS
MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.
The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.
MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.
Furniture is acquired for 45 employees what is the minimum number of manual or electric height -adjustable work surfaces needed to meet Feature V02: Ergonomic Workstation Design. Part 2 Provide Height-Adjustable Work Surfaces?

Question59: Which of the following hazardous materials is known to impair the intellectual development of children and the unborn during pregnancy?

Question60: What are possible impacts of poor lighting color rendering and flicker on people's health?

Question61: Supplemental light fixtures are provided to occupants upon request at no cost within a WELL building. This benefit will enhance occupant comfort by

Question62: During a project review meeting, a member of the facility management team states that asbestos containing materials (ACMs) may be present within the project boundary. What strategy should the project team follow to evaluate this issue?

Question63: A project administrator is preparing documentation for a project's submittal. In addition to the Letters of Assurance, what other documents must the project administrator submit to support the features being pursued?

Question64: Which of the following is an effective measure for a new construction project to reduce noise from nearby traffic?

Question65: For which parameters does the WELL Building Standard™ set performance-based thresholds through Feature A01: Air Quality?

Question66: The cafeteria manager for an office building has been asked to meet Feature N11: Responsible Food Sourcing.
This requires a percentage of the total produce line and a percentage of the animal product line to meet specific sustainable sourcing requirements. Which of the following reflects the minimum required thresholds?

Question67: Based on the WELL Building Standard, what is a possible contributing factor to Type 2 diabetes?

Question68: Occupants of an office have reported that the drinking water is cloudy in appearance. What should the water be tested for?

Question69: A WELL AP offers design guidance to support active occupants and visitors of a university project with a Bike Score of 50. There will be approximately 100 peak visitors and 1.500 regular occupants in the building The WELL AP should advise that the university project provide

Question70: The design team for a new office building protect is trying to achieve a point for Feature X08 Materials Optimization by selecting materials with enhanced chemical restrictions. They are preparing a list of products to submit to the owner for approval All of the selected products are inventoried to 100 parts per million (ppm).
Which of the following products should the design team give priority to in order to achieve this point?

Question71: A project team conducts a daylight simulation for an office building and the result is slightly lower than the daylight simulation requirement of sDA300,50%. The window locations can no longer be changed. Which of the following strategies can be pursued to help meet the daylight simulation requirement?

Question72: Which of the following references could be used for Feature L02: Visual Lighting Design, Part 1: Provide Visual Acuity?

Question73: A building operations staff and a WELL AP are developing a cleaning plan for a new office building. What is the best strategy to minimize environmental damage from the cleaning process?

Question74: A client would like to include a designated smoking area in a WELL project in order to satisfy tenants' requests According to the requirements of Feature A02: Smoke-Free Environment, what guidelines should the WELL AP recommend for the location of the designated smoking area?

Question75: A small percentage of building occupants report chronic thermal discomfort. What strategy should be used to address this problem?

Question76: What is the minimum number of responses required for a project with 300 regular occupants to comply with the requirements of Feature T02: Verified Thermal Comfort?

Question77: The design for a WELL budding has restricted volatile organic compounds (VOGs> emissions (or carpeting and resilient flooring that covers over 0O% of the surface area. To achieve Feature X06 VOC Restrictions, which of the following standards must the carpeting and resilient flooring comply with?

Question78: An owner of a new commercial office building is interested in achieving Feature N08: Mindful Eating. What space would need to be included and what is the maximum allowable distance from the project boundary?

Question79: A total of 20 varieties of beverages are sold on a daily basis in a WELL Certified building Which of the following, strategies could have boon implemented in the non-based spaces of this building (o comply with Feature N03 Refined Ingredients?

Question80: The Brightside Company is pursuing WELL Certification under the WELL Building Standard for their new office headquarters. One company goal is to better support employees in making healthy eating choices, both at work and at home. What can the Brightside Company do to support and achieve credit under Feature N07:
Nutrition Education Optimization?

Question81: Which of the following is an effective strategy to promote stair use by building occupants?

Question82: Which of the following are short-term effects of poor indoor air quality?